Project ID Project Description Capital Plan Scope Objective Historical Scope Change Narrative Current Scope Change Narrative
Unknown
EM050209 Power Infrastructure Restoration - Harlem River Lift Bridge 2010-2014 As a result of Superstorm Sandy, flooding occurred at the Manhattan and Bronx substation locations of the Harlem River Lift Bridge. This flood caused extensive damage to equipment, which is critical for MNR's traction and bridge facility power. The project scope is to repair the two alternating current (AC) facilities.   Completion date adjusted due to waterproof rollup doors procurement and delivery delays. Completion date adjusted to reflect the current work plan. Budget has been increased to fund the change orders 1 & 2 to the cable contract.
 
M5020205 New Haven Line Stations Improvements 2005-2009 This project will rehabilitate station elements in need of investment and enhance accessibility and customer safety at Port Chester and Rye. N/A Original scope was to rehabilitate all eight New Haven Line NY Stations under one contract. However, because the proposals to perform the work exceeded the established budget; MNR revised the project scope and repackaged it to be performed over two phases with the second phase in the next program. Platform canopies at Rye Station were subsequently added under this contract from available budget funds within the Project, extending completion to March 2011.
 
T6030227 On-Board Audio Visual System 2010-2014 This project consists of the design, development, procurement, and installation of an on-board audio visual system (OBAV) on buses operating in Authority Revenue service. The system will announce and display bus route stops, as well as display and announce special messages. The signage will meet the Americans with Disabilities Act (ADA) standards.   Procurement approach for software platform development revised. Schedule reflects the forecast completion of the project deployment phase, which was awarded as a separate contract in May 2022. Additional time required due to COVID-19 pandemic. The base contract was completed in December 2019.
 
T7160716 Upgrade Power Systems at the Rail Control Center and Power Control Center 2015-2019 This project will upgrade the heating, ventilation, air conditioning and the power distribution systems at NYC Transit's Rail Control Center (RCC) and Power Control Center (PCC) facilities located in the borough of Manhattan.   After award of contract, delay due to change to generator platform design. Schedule updated to reflect current work plan. The delay in substantial completion is due to time extensions related to various work orders and to complete remaining work. Budget increase is due to additional costs required during construction.
 
Platform
D607TN85 Paint - Steel Members of the Suspended Span Deck - Throgs Neck Bridge 2010-2014 Incidental lead abatement, field cleaning, and painting will be performed on all areas where steel repair and/or replacement is required on the suspended span deck of the Throgs Neck Bridge. This project will also remove the existing work platform under the bridge and clean and repaint the areas underneath the work platform contact points, once the platform is removed. Project start is coordinated with the schedule for structural work that is planned for award as a single contract. Budget reflects the current estimate based on completed design. This project is closed out.
 
D701VN89 Restoration of the Granite Facade and Tower Pier Foundation and Relocation of the FDNY Mooring Platform - Verrazano-Narrows Bridge 2015-2019 This project will rehabilitate the Verrazano-Narrows Bridge granite facade and restore the protection for the tower pier foundation. In addition, the FDNY mooring platform will be relocated to meet current FDNY fire boat requirements.   This project was substantially completed July 2020. Budget reduction based on interim project closeout.
 
EL0502ZC Restoration of the Long Beach Branch 2010-2014 Replacement of damaged signal, power and communications systems components and cabling along the right-of-way including grade crossings and station platforms, including: - Central Instrument locations at Long Beach Yard and Lead Tower; - Signal huts, impedance- bonds and battery sets; - Grade crossings including manholes, conduit, cabling, gates, cases and control huts; - Signal cabling, aerial messenger cable and cases; - Communications network cabling, aerial messenger cable and cases which supports the communication network; - Communications equipment rooms at station buildings; - Third rail cabling and conduits, and switch boxes; - Station platform lighting at Oceanside and Island Park, including cabling, conduits, poles, fixtures and lamps.   Substantial Completion achieved 4/2021
 
EL0902ZF Infrastructure / System Upgrades (Various Locations) 2010-2014 Replacement of 3rd rail power cable and switches at Shea Yard and Far Rockaway Branch right-of-way, repairs to skylights, windows, roofing and HVAC units in Hillside Support Facility, replacement of platform shelter shed at Westbury Station, platform lighting at Oceanside and Island Park Stations, replacement of roll-up gates for Penn Station entrance, miscellaneous right-of-way clean-up.   Project completed and closed.
 
ET040201 Recovery: South Ferry Station Complex - Clean Up, Loop Opening, and Design 2010-2014 South Ferry Terminal is located in lower Manhattan near Battery Park and the Staten Island Ferry Terminal. It is the terminus for the IRT Broadway-7th Avenue Line. This project will design for the comprehensive repair/replacement of storm-damaged station components at new South Ferry Station, including architectural finishes, structural elements, elevators, escalators and other ancillary equipment. The construction phase will be funded under a separate project. This project also addressed initial clean-up efforts at the new South Ferry Station, as well as, minor work at the old South Ferry Station, including gap fillers, stair entrances, platform work, new opening through new South Ferry Station, signage, lighting, and associated work on the loop track to enable train service to lower Manhattan. The current budget was reduced to reflect the project scope, while the balance was transferred to fund various individual recovery projects and establish a budget reserve project for future efforts. The schedule reflects the design phase of the station restoration project, which will be funded under a separate project, "Recovery: South Ferry Station Complex". The initial clean up work and reopening of the old loop were completed in April 2013.  
 
ET160303 Mitigation Reserve: Bus Rapid Transit - Staten Island North Shore: Bus Stations 2010-2014 This project was a budgetary reserve to reconstruct the former North Shore branch of Staten Island Rapid Transit North Shore Railroad as an exclusive-use two-lane busway with nine stations. It was for projects to construct these stations, including side platforms, canopies, fare machines, lighting, benches and other Select Bus Service amenities. This project is a budget reserve for various mitigation efforts. As the budget is gradually transferred to individual projects for design and construction, the available balance in this project will be reduced. This project was reprogrammed per the approved July 2017 Plan Amendment, reflecting changes in the Sandy Mitigation program that align with agency-wide priorities and anticipated funding.
 
G6090117 ESA: Manhattan Structures 2 2010-2014 East Side Access: Third Party Construction for the new Long Island Rail Road - Grand Central Terminal caverns including platforms for eight trains and a mezzanine waiting area. The budget and schedule have been revised to reflect the results of the risk assessment presented to the MTA Board in May 2012. Budget allocation change reflects the transfer of select budget and scope elements from the Facility Systems contract. Scope transferred to Manhattan North Structures, Manhattan South Structures, and other projects. Overall ESA project scope unchanged.
 
L502042B Broadway Platform Replacement 2005-2009      
 
L502042C Seaford Platform Replacement 2005-2009      
 
L502042F Babylon Station Platform Rehab 2005-2009      
 
L50206VE PS Platform Modifications 2005-2009      
 
L50501S8 Audio Visual Paging System 2005-2009 Installation of back-end electronics and platform signs at 80 stations. Budget was revised based on costs of construction and support requirements during construction Project completed and closed.
 
L60204UB Massapequa Station Platform Replacement 2010-2014 This project will design and construct the replacement of the station platform at Massapequa station, on the Babylon Branch in Nassau County. The elevator, escalator, platform waiting rooms, lighting, signage, platform canopies, and other station elements will also be replaced.   Project completed and closed.
 
L60204UC Wantagh Station Platform Replacement 2010-2014 This project will design and construct the replacement of the station platform at Wantagh station, on the Babylon Branch in Nassau County. The escalator, platform waiting rooms, lighting, signage, platform canopies, and other station elements will also be replaced. A new elevator will also be installed, making the station wheelchair accessible.   Substantial Completion achieved 9/2018
 
L60204UF Mets / Willets Point Station Renovation 2010-2014 This project, combined with the 2005-2009 initiative, will make improvements to the Mets-Willets Point station on the Port Washington Branch in Queens. Work includes track and signal improvements to facilitate operations at the center platform, new passenger elevators for wheelchair access to the LIRR platform, new tactile-warning strips on platforms, platform/canopy extensions, pre-fabricated platform shelters and drainage improvements at track level.   Project completed and closed.
 
L60304TU Jamaica Capacity Improvements - Phase One 2010-2014 This Phase 1 of a multi-program initiative, will construct a new platform at Jamaica station and other associated infrastructure, including switch, signal, and track components, to facilitate new Cross Borough Scoot service between Jamaica and Brooklyn, in conjunction with future East Side Access service.   Construction Complete revised due to other higher priority system-wide track work bumping the planned install date of the final JCI Phase 1 high-speed crossover (Union-87).
 
L70204EJ Huntington Station E. Pedestrian Overpass [SBDP] 2015-2019 Replacement of the East End Pedestrian Overpass at Huntington Station of the Port Jefferson Branch. The existing 1980 East Pedestrian Overpass bridge provides access to/from the north and south parking garages as well as access to station platforms. The overpass exhibits deterioration from weather and age. Replacement will address customer safety needs and improve the commuting experience.   Substantial Completion achieved 8/2022.
 
L70204UA Station Component Replacement 2015-2019 This combines what had previously been separate projects - Station Signage, Platform Railing Replacement, Station & Building Electrical Systems, and Station Platform Lighting Replacement into one single project. This project will address station building components at various stations, including work being performed as part of the Mentor Program.   Construction Start has been delayed due to manpower issues.
 
L70204UL Station Platform Lighting 2015-2019 This project will replace station platform lighting at various locations throughout the LIRR system.   Project Superseded.
 
L70204UN Nostrand Ave Station Rehabilitation 2015-2019 This project will involve improvements to this viaduct station in Brooklyn including demolition and replacement of both platforms, replacement of staircases, canopies, railings, station lighting, along with security and communication systems. Two new elevators will be installed, making this station wheelchair accessible.   Project achieved Substantial Completion as of 1/2020
 
L70204UP Port Washington Station Improvements 2015-2019 This project will involve a number of improvements, including replacement of the station overpasses and platform canopies, along with other station improvements. Milestone dates are not available due to project still being under development.   Project on hold pending resolution of real estate issues.
 
L70204UQ Babylon Station Platform Replacement - Design Only 2015-2019 This project provides for design of the Babylon Platform Replacement effort. Scope will include demolition and reconstruction of the station's two platforms and platform waiting rooms, as well as renewal of the canopy roofing system, and replacement of platform lighting, staircases, escalators, and elevators. Undertaking the design in this capital program allows for the construction to be undertaken in a future capital program.   Design Only Project completed 11/2020; Design Refresh started 1/2023
 
L70204UR Station Platform Railing Replacement 2015-2019 This project will replace station platform at various locations throughout the LIRR system.   Project Superseded.
 
L70204UX Hunterspoint Avenue Station Renewal 2015-2019 This project was to include replacement of the platform, canopy, lighting and other station components. It is now anticipated to be budgeted in a future Capital Plan. Installation of a new elevator will make this station wheelchair accessible. Milestone dates are not available due to project still being under development. Design only. Reduced to provide adequate funding for the completion of Main Line Double Track Phase 2  
 
L70204UY Elmhurst Station-New Station 2015-2019 This project was to undertake environmental review and preliminary design for a new Elmhurst Station on the LIRR's Port Washington Branch in Queens. The station is anticipated to include two new 12-car platforms, along with staircases, new elevator service, platform railings, platform shelters, ticket vending machines, as well as lighting, communication and security systems, and site improvements. Undertaking environmental review and preliminary design will allow for the construction of the station in a future capital program. Reduced to provide adequate funding for the completion of Main Line Double Track Phase 2  
 
L70204UZ New Republic Station on Main Line 2015-2019 This project was to include two new 12-car platforms, along with staircases, new ADA ramps, platform railings, platform shelters, ticket vending machines, as well as lighting, communication and security systems, and site improvements. Milestone dates are not available due to project still being under development. Reduced to provide adequate funding for the completion of Main Line Double Track Phase 2  
 
L70204V3 Mentor Station Component Improvements 2015-2019 This project will undertake Mentor firm procurement for work at three station: Laurelton Station, Locust Manor, and Huntington Station. Laurelton and Locust Manor require construction activities from 3rd Part Mentor Contractors. The construction activities for Laurelton are rehabilitation to the canopy, platform and staircases. Locust Manor construction activities are chain link fencing replacement and rehabilitation of the pedestrian walkway and sidewalk curbs. Huntington Station requires Mentor design consultant for the design of the Huntington Pedestrian Overpass.   Substantial completion achieved 12/2019
 
L70204V5 Enhanced Station Initiatives [ESI]: Phase 1- 8 stations: Deer Park, Brentwood, Merrick, Stony Brook, Syosset, East Hampton, Bellmore, and Farmingdale. 2015-2019 As part of Enhanced Station Initiatives [ESI], this project will enhance the appearance, function, safety, and customer experience at 8 stations: Deer Park, Brentwood, Merrick, Stony Brook, Syosset, East Hampton, Bellmore, and Farmingdale. The work includes: Platform Replacement/Renewal, Station Building Repairs, Surrounding Station Building Rehabilitation and Amenities Installation including USB charging stations, Wi-Fi, CCTV cameras, bike racks, high efficiency lighting, wayfinding signage and totems, and MTA Arts & Design permanent artwork.   Substantial completion achieved 12/2019
 
L70204V6 Enhanced Station Initiative: Stewart Manor (SBMP) 2015-2019 This project will undertake station enhancements at Stewart Manor Station, located on the Hempstead Branch in Nassau County. Scope of work includes installation of new art glass within the platform shelter sheds, new benches, landscaping, new stamped concrete sidewalks, bike racks, new curbs and new railings. Construction work will be performed by a firm which is procured though the MTA's Small Business Mentor Program.   Substantial completion achieved 6/2019
 
L70204V7 Enhanced Station Initiative: Port Jefferson 2015-2019 This project will provide station enhancements at Port Jefferson Station, located on the Port Jefferson Branch in Suffolk County. Scope of work includes replacement/upgrade of various station components on the platforms (including platform shelters sheds, railings, new LED lighting and CCTV security cameras), along with improvements to the station building and the station plaza area.   Substantial completion achieved 6/2019
 
L70204VT St Albans Station Renewal SBDP 2015-2019 This project includes the following improvements at St Albans Station in Queens: improving the concrete platform by removing cracks, providing concrete surface hardening, and replacing all structural expansion joints, removing and replacing deteriorated tactile warning strips and thermoplastic "Watch the Gap" signs, new signage, replacing the platform shelter shed and upgrading the lighting to LED. Work also includes replacing of chain-link fencing, performing structural renewal to the staircase walls and the staircase landing areas, and replacing/upgrading staircase treads and staircase handrails. Work will be performed by a 3rd party contractor procured under the MTA's Small Business Development Program and also by LIRR forces.   Substantial completion achieved 12/2021
 
L70204VV Lynbrook Station Improvements 2015-2019 Lynbrook Station rehabilitation includes improvements to both platforms, as well as station building enhancements and other amenities. Work includes under-platform improvements; rehabilitation of the two platform waiting rooms, windows, doors, and benches; replacement of the platform canopy and platform stair enclosures; installation of CCTV cameras; renovation of elevator shafts; and replacement of signage.   Substantial completion achieved 8/2020
 
L70204VW Amityville Platform Canopy Roof 2015-2019 This project will replace the platform canopy roof at the Amityville station in Suffolk County. The platform canopy is currently subject to leaking due to structural deterioration of the roofing panels. This project will remove and replace the roofing system and install new drainage downspouts. A 3rd party construction contractor will be procured under the MTA's Small Business Development Program.   Substantial completion achieved 2/2020
 
L70204VZ Elmont Station 2015-2019 This project provides for design and construction of a new station, Elmont, on the Main Line between Queens Village and Bellerose Stations, that will support the Belmont Park Redevelopment Project. Project work includes design and construction of all the elements required for the new station: Installation of north and south side platforms; a pedestrian overpass; all associated station elements [canopies, lighting, stairs/ramps, CCTV/Security equipment/rooms, audio/visual display boards/signage, elevators and associated machine rooms].   Beneficial Use achieved 10/2022
 
L70206VP Penn Station Elevator / Escalator Replacement 2015-2019 This project will include the renewal of two-decade old elevators and escalators in the LIRR area of the station, along with rehabilitation of stairs, platform lighting and other station components.   Beneficial Use achieved 4/2021
 
L70206VS Moynihan Train Hall 2015-2019 The Moynihan Train Hall project will convert back of house areas of the Farley Post Office to a world class Train Hall with a vaulted glass ceiling for Amtrak and Long Island Rail Road. Two escalators to platforms 4 through 8 and one escalator to platform 3 will provide access to and from the Train Hall, while entranceways at 8th Avenue and 31st Street and 8th Avenue and 33rd Street will provide Train Hall and West End Concourse Access.   Beneficial Use achieved 12/2020
 
L70501SR Station Platform CCTV Cameras 2015-2019 This project will provide for CCTV cameras installation throughout various LIRR locations.   Beneficial Use achieved 9/2021
 
L8020401 Station Renewals: Various Locations 2015-2019 This project is a reserve for design and construction of station renewals such as platform replacement, lighting replacement, plaza and parking renewal will be performed at various stations.   Budget changed to reflect breakout of projects.
 
L8020402 Station Platform Components: Various Locations 2015-2019 This project is a reserve for design and construction of station platform renewals such as railing installation, signage, ESI amenities, platform replacement, stairs and shelter sheds at various stations   Budget changed to reflect breakout of projects.
 
L8020409 ADA Hollis Station 2015-2019 Project includes the demolition of the existing 4 car platforms, construction of the new 8 car platforms and canopies, construction of a new boiler room and IT and Comm rooms, and improved access/egress, new stairs, ADA compliant ramps and a new ADA compliant elevator to service the south platform.    
 
L8020411 ADA Locust Manor Station 2015-2019 Construct two new hydraulic elevators at the west-end pedestrian underpass to provide ADA access. Work also includes; elevator shafts & equipment, platform connections, retaining walls, sidewalks, TVM shelter and other associated work.   Completion date revised to reflect contractor's schedule.
 
L8020412 ADA Forest Hills Platform Extensions and Elevator 2015-2019 Project includes the demolition of the existing 6 car platforms, construction of the new 10 car platforms and canopies, a station restroom remodel, improved access/egress, new stairs, and ADA compliant ramps.    
 
L8020413 ADA Copiague Station 2015-2019 Construct one new hydraulic elevator at the center island platform between the two tracks. Work also includes; elevator machine room, associated elevator equipment, power upgrade, communication and safety/security systems, elevator vestibules, parking improvements, sidewalks, and other associated work.    
 
L8020414 ADA St Albans Station 2015-2019 Construct new elevator at St. Albans to provide ADA access. Additional Work required; New elevator shaft & equipment, center island platform & canopy extension, east-end tunnel modifications, parking improvements and ADA accessible path.   Completion date revised to reflect contractor's schedule.
 
L8020418 Mets-Willets EIC Relocation 2015-2019 The purpose of this project is to construct an EIC platform in Ronkonkoma Yard and an employee fit-out in the existing Mid-Suffolk Yard Welfare Facility.   Project Completion date revised due to extended delivery time for a prefabricated storage facility due to supply chain issues
 
L8020419 Northport Platform Replacement 2015-2019 The scope of this project is to replace the passenger platform at Northport Station. The 3P contractor will be providing the platform slabs and railings (installed by F/A), as well as installing new shelter sheds, ADA ramp, boiler room and a new plaza area.   Substantial Completion reached 12/2023
 
L8020420 ADA Amityville Station 2015-2019 Construct one new hydraulic elevator at the center island platform between the two tracks. Work also includes; elevator machine room, associated elevator equipment, power upgrade, communication and safety/security systems, elevator vestibules, parking improvements, sidewalks, and other associated work.    
 
L8020421 ADA Laurelton Station 2015-2019 Construct one new hydraulic elevator at the center island platform between the two tracks. Work also includes; elevator machine room, associated elevator equipment, power upgrade, communication and safety/security systems, elevator vestibules, ADA path of travel to new elevator, sidewalks, and other associated work.   Completion date revised to reflect contractor's schedule.
 
L8020422 ADA Massapequa Park Station 2015-2019 Construct one new hydraulic elevator at the center island platform between the two tracks. Work also includes; elevator machine room, associated elevator equipment, power upgrade, communication and safety/security systems, elevator vestibules, parking improvements, sidewalks, and other associated work.   Completion date revised to reflect contractor's schedule.
 
L8020423 ADA Lindenhurst Station 2015-2019 Construct one new hydraulic elevator at the center island platform between the two tracks. Work also includes; elevator machine room, associated elevator equipment, power upgrade, communication and safety/security systems, elevator vestibules, parking improvements, sidewalks, and other associated work.    
 
L8020426 Babylon Station Platforms Replacement 2015-2019 Project includes the demolition of the exisiting 12 car platforms and canopies and construction of a new 12 car ASIM (Automatic Snow and Ice Melting System) platform and new canopies. Work also includes: installation of a new boiler room, improved access/egress, new stairs installation on east end of station, replacement of 2 existing elevators and 2 existing escalators, and installation of 2 new elevators on the west end of station    
 
L8020428 Jamaica West End Vertical Transportation 2015-2019 The purpose of this project is to investigate and develop a preliminary design for the addition of vertical transportation to the west end of Platforms A-F in Jamaica Station for a more efficient flow of pedestrian traffic and passenger accessibility between platforms.    
 
L8020601 Penn Station HVAC, Platform,& Building Improvement 2015-2019 This project includes the design or floor surfacing, column cladding, LED lighting, new tactile stripes vertical surface painting, line-of- sight ceilings for platforms 7-11 and the construction of four stair replacements and twelve staircase spruce-ups.   Funds were transferred to Penn Station Platform Improvements and to Penn Station NY-33rd Corridor (Phase 2 LIRR 2020-2024 Plan Contribution), reflecting platform and HVAC scope respectively.
 
L8020603 PSNY Platform 7 & 8 Stairs Replacement 2015-2019 The scope of work is to repair platform / column / wall; replace tactile warning strip, vertical coating, floor coating, signage, electrical removals and new light installations.   The funds for this project were split out from Penn Station HVAC, Platform, & Building Improvement, as well as increases to reflect additional support from external agencies. Project put on hold.
 
L8020604 Penn Station NY-33rd Corridor (Phase 2 LIRR 2020-2024 Plan Contribution) 2015-2019 This project includes the balance of the construction of the expanded 33rd St Corridor/LIRR Main Concourse, reflecting the portion of funds provided by the MTA and budgeted in LIRR's 2020-2024 Capital Plan. Funds were transferred from Penn Station HVAC, Platform, and Building Improvement, reflecting portion of budget for replacement of HVAC equipment.  
 
L8060103 Yard Improvements at Various Locations 2015-2019 This project includes extension of Port Washing Yard Tracks 1 & 8, including new overpass and parking, construction of a covered EIC platform for two 12-car consists with storage facility and installation of wayside power for 2 tracks, ASC, and sewer connection at Mid-Suffolk Yard.    
 
L8090402 Access Control at Stations, Platforms, Yards & Fac 2015-2019 This project includes the replacement and upgrade of Access Control and Security Fire/Intrusion/Alarm Monitoring devices at Stations/Station Buildings, Platforms and facilities system wide   Delays are due to contractual issues.
 
M5020107 GCT Platform Improvements 2005-2009      
 
M5020201 Hudson Line Stations Improvements 2005-2009 Component rehabilitation work is advanced in three packages: Package A - Hastings, Dobbs Ferry and Irvington: inbound platform and canopy. Package B - Philipse Manor, Scarborough, and Ossining: new inbound and outbound platforms and canopies. Additionally: Philipse Manor rehabilitation of existing overpass, Scarborough: Construction of new overpass, Ossining: Construction of new stairs from the elevated building/vehicular overpass to east and west side platforms and parking, new elevators, and rehabilitation of the elevated walkway on the North and West sides of the station building. Package C - (Tarrytown), refer to project Tarrytown Station Improvement project M502-99-01.   Inclusion of Model Station technology at all three stations being reconstructed as part of the referenced project - Philipse Manor, Scarborough and Ossining. Model station technology includes provisions for closed circuit television cameras, Liquid Crystal Display (LCD) monitors, variable message signs, and increased data and communications capabilities.
 
M5020202 Croton-Harmon and Peekskill Station Improvements 2005-2009 This project will provide for the design and construction of the improvements to the Croton-Harmon and Peekskill Stations as follows: The Improvements at Croton- Harmon Station consist of complete roof replacement of North Overpass and Staircases installation of a fall protection system, bird deterrent system, Also included is exterior painting. Platform improvements include two new car lengths of platform with canopy, and VMS signage. The improvements at Peekskill Station consist of complete renovation of the Overpass and Staircases to include operable windows, lighting, heating, elevator upgrades, installation of a fall protection system, bird deterrent installation, and painting. Platform improvements consist of renovation of both inbound and outbound platforms to include canopies, platform edge repairs and installation of tactile warning strips, platform guardrail, staircase, lighting, public address and VMS signage. Additional scope was added to the project for Croton Harmon station improvements including HVAC and new interior elements such as lighting fixtures, ceiling tiles, wall panels, ticket office panels, concession stand panels, and new floor tiles, etc. Also included are new bathroom upgrades.   Construction previously deferred from the project in earlier amendments was approved by the MTA Board to be advanced under this project. Construction award less than project estimate due to competitive favorable bids. Improvements to the HVAC system for the Croton Harmon station was added to the project. Additional station interior improvements have been added to the scope.
 
M5020207 Station & Platform Info. Signs 2005-2009      
 
M5029901 Tarrytown Station Improvement 2005-2009 The work to be performed at Tarrytown as part of the Hudson Line Stations Improvements and will include phased platform replacements, and replacing of North and South overpasses to be fully enclosed and heated with elevator service on the North overpass. Platform reconstruction includes canopies, heated shelters, lighting, benches, public address system, visual information system and tactile warning strips. This project is funded with American Recovery and Reinvestment Act funds.   Construction award less than project estimate due to competitive favorable bids. Project surplus funds removed from the project.
 
M6020101 Grand Central Trainshed and Park Avenue Tunnel Structure Rehabilitation 2010-2014 Under the continuation of a multi-Capital Program effort, a comprehensive inspection of the Grand Central Terminal Trainshed and the Park Avenue Tunnel structure will be performed. Funding is also provided for the design of repairs identified from the inspection and to construct the highest priority repairs. Design completion delayed due to revision in procurement guidelines for the trainshed and platform work scope. Current construction schedule reflects a major component of the work to begin in 2014. Budget decreased to reflect latest estimate. Completion date adjusted to reflect current work schedule.
 
M6020104 Grand Central Terminal Trainshed Track Structure Pilot Replacement Program 2010-2014 This pilot project will develop methods for the replacement of the existing track structure (ballast, ties, rail, third rail and repairs to the waterproofing) on the platform tracks located in Grand Central Terminal on both the upper and lower levels. Two tracks will be replaced under this pilot program.   This project was reprogrammed per the MTA Board approved July 2013 Plan Amendment.
 
M6020107 Grand Central Terminal Platform Edge Rehabilitation 2010-2014 This project will continue improving the platforms in Grand Central Terminal by renewing nine previously identified deteriorated platform edges.   This project was reprogrammed per the MTA Board approved July 2013 Plan Amendment.
 
M6020202 Fordham Station Improvements 2010-2014 This project will make necessary investments to improve conditions for customers at Fordham Station through widening the platform and canopy on the outbound platform.   Revised budget reflects added scope.
 
M6020203 Harlem Line Stations Component Renewal 2010-2014 This project will design select components improvements at select stations including portions of platforms, canopies, lighting, platform amenities, stairs, shelters and elevators   Revised project completion date reflects the design of PODS at 11 stations and Emergency Repairs at Various Stations. Project surplus funds removed from the project.
 
M6020206 New Haven Line Stations Component Renewals 2010-2014 The second phase of the New Haven Line Stations project will renew station components such as platform structures, canopies, overpasses/underpasses and stairs at Mount Vernon East, Pelham, New Rochelle, Larchmont, Mamaroneck and Harrison. Two small business mentoring programs have been added to the project scope for construction of guardrail improvements at the Larchmont station and at Pelham and New Rochelle stations, and the installation of a bicycle parking slab with racks on the outbound side of the Pelham station.   Two small business mentoring programs have been added to the project scope for construction of guardrail improvements at the Larchmont station and at Pelham and New Rochelle stations, and the installation of a bicycle parking slab with racks on the outbound side of the Pelham station. Project surplus funds removed from the project.
 
M7020103 GCT Platform Rehabilitation 2015-2019 The project is to continue to rehabilitate platform edges and expansion joints within Grand Central Terminal.   Revised completion date reflects the current work plan. Project surplus funds removed from the project. Project schedule was revised for additional days to perform lead abatement plus paint work.
 
M7020214 East of Hudson Station Priority Repairs 2015-2019 This project provides for priority repairs at two stations on the Metro-North New Haven Line: Rye and Larchmont to address structural deficiencies in platform surfaces and platform edges, expansion joints, tactile warning strips and stairs. In addition, expansion joint repairs will be made at 13 other stations on the Harlem and Hudson Lines. This project will address these deficiencies with priority repairs in order to preserve the lifespan of these assets and address customer safety issues.   Budget was increased for project needs. Revised completion date reflects the current work plan.
 
M7020216 Port Jervis Station Improvements 2015-2019 The project is for Metro-North to design and construct a high-level side platform in the location of the existing grade-level platform with an ADA-compliant ramp for access to the platform. The new platform will include a single car-length canopy, shelter, and CSI elements.   Budget was increased for project needs. Revised completion date reflects the current work plan.
 
M8020202 Harlem Line Station Renewals 2015-2019 This project includes the design and construction for a phased renewal of station components at Botanical Gardens, Woodlawn, Wakefield, Mount Vernon West, Hartsdale, Scarsdale and North White Plains on the Harlem Line. Upgrades at these stations may include new platforms, new lighting, improved customer information systems, new platform canopies, and modernized passenger waiting areas. Project budget was revised per the Plan Amendment approved by the CPRB July 31, 2023. Work is being accomplished under 3 Bronx Stations, M8020209. Revised schedule reflects the current work plan.
 
M8020203 Harlem ADA Improvements 2015-2019 The project is a reserve for ADA improvements at select stations on the Harlem Line. Improvement will include wheelchair accessibility for access to each platform in both directions of travel. Project budget was revised per the Plan Amendment approved by the CPRB July 31, 2023.  
 
M8020204 East of Hudson Priority Repairs 2015-2019 This project provides for priority repairs at stations East of Hudson. Metro-North will address structural deficiencies in platform surfaces and platform edges, expansion joints, tactile warning strips and stairs. This project will preserve the lifespan of these assets and address customer safety issues. Project budget was revised per the Plan Amendment approved by the CPRB August 30, 2022. Scope of work was transferred to other projects in this element.  
 
M8020205 Ludlow Station Accessibility Improvements - Design only 2015-2019 Metro-North Railroad is committed to improving accessibility throughout its service territory and continually works to ensure facilities are well maintained, safe, and operating as intended. Currently, Metro-North's train station at Ludlow has a ramp to provide accessibility to northbound service but has no accessibility to the southbound platform. The consultant shall perform site surveys and investigations to gather information and develop a Station Accessibility Assessment Report concerning the provision of vertical access to the station. Project budget was revised per the Plan Amendment approved by the CPRB July 31, 2023. Construction will be addressed in the 2025 - 29 Program.  
 
M8020208 North White Plains Platform Repair 2015-2019 This project consists of Priority Structural Repairs at MTA Metro-North Railroad North White Plains Station located on the Harlem Line.    
 
N50905HA Freeport Platform & Waiting Rm 2005-2009      
 
N6110101 Complete implementation of MTA Business Service Center 2010-2014 In April 2005 the MTA Board commissioned the consulting firm Booz Allen Hamilton to assess the feasibility of implementing a shared services organization across the MTA and its operating agencies. The areas reviewed include Finance, Human Resources and Information Technology. The study concluded that the MTA could realize efficiencies by streamlining back-office processes into a Business Service Center. In 2009 MTA undertook to implement the Business Service Center plan with $45 million in contracts funded from the 2005-2009 Capital Program to extend the Metro-North and MTA Headquarter PeopleSoft Platform through out the MTA. The goal of the project in the 2010-2014 Capital Program is to complete this work.    
 
T5041155 Rehabilitate Beach 67th Street Station - Rockaway Line 2005-2009 This project will rehabilitate the Beach 67 Street Station on the IND Far Rockaway Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platforms (concrete slab), windscreens & guardrails and station lighting. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction.
 
T5041156 Rehabilitate Beach 60th Street Station - Rockaway Line 2005-2009 This project will rehabilitate the Beach 60 Street Station on the IND Far Rockaway Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platforms (concrete slab), windscreens & guardrails and station lighting. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction.
 
T5041157 Rehabilitate Beach 44th Street Station - Rockaway Line 2005-2009 This project will rehabilitate the Beach 44 Street Station on the IND Far Rockaway Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platforms (concrete slab), windscreens & guardrails and station lighting. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction.
 
T5041158 Rehabilitate Beach 36th Street Station - Rockaway Line 2005-2009 This project will rehabilitate the Beach 36 Street Station on the IND Far Rockaway Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platforms (concrete slab), windscreens & guardrails and station lighting. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction.
 
T5041159 Rehabilitate Beach 25th Street Station - Rockaway Line 2005-2009 This project will rehabilitate the Beach 25 Street Station on the IND Far Rockaway Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platforms (concrete slab), windscreens & guardrails and station lighting. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction.
 
T5041161 Rehabilitate Beach 90th Street Station - Rockaway Line 2005-2009 This project will rehabilitate the Beach 90 Street Station on the IND Rockaway Park Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platform edges, windscreens, guardrails and platform canopies. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction. Budget change due to financial closeout activities.
 
T5041162 Rehabilitate Beach 98th Street Station - Rockaway Line 2005-2009 This project will rehabilitate the Beach 98 Street Station on the IND Rockaway Park Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platform edges, windscreens, guardrails and platform canopies. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction. Budget change due to financial closeout activities.
 
T5041163 Rehabilitate Beach 105th Street Station- Rockaway Line 2005-2009 This project will rehabilitate the Beach 105 Street Station on the IND Rockaway Park Line in Queens. All station elements will be rehabilitated during this project. The original project consisted of a limited rehabilitation of the highest priority defects only. Additional work included replacement of platform edges, windscreens, guardrails and platform canopies. Budget was revised based on the described scope changes. Budget was revised based on costs of construction and support requirements during construction. Budget change due to financial closeout activities.
 
T5041411 Platform Rehab 4 Stations 2005-2009      
 
T5041421 Station Component Repairs 2005-2009 This project is for the elimination of deficient station components located in various stations systemwide. Work may include the repair or replacement of station stairs, platform edges, ventilators, and canopies. Scopes for specific locations will depend on individual station needs.   This project is the funding source for multiple subprojects. The budget was revised based on the costs of design and/or construction requirements for various subprojects. Budget change due to financial closeout activities.
 
T5049915 Gap Fillers Union Square Station Phase 3 2005-2009 This project will replace nine gap fillers on the southbound local platform at the Union Square-14th Street Station on the IRT Lexington Avenue Line in Manhattan. This project is the final phase to replace gap fillers at all platforms in this station. This is a new project added to the capital program and funded with through the American Recovery and Reinvest Act (ARRA). Budget was revised based on costs of construction and support requirements during construction.
 
T5080307 Signal Key-By Circuit Modifications Phase 2 2005-2009 This project will upgrade signal locations systemwide by incorporating a signal key-by timer into the existing circuits of all automatic and approach signals at the leaving end of station platforms.    
 
T5080609 Platform Edge CCTV 9 Stns XTN 2005-2009      
 
T6040406 Passenger Station Local Area Network at 4 Stations 2010-2014 This project will install Passenger Station Local Area Network (PSLAN) infrastructure at 4 stations, which will support the rollout both of Help Points and the New Fare Payment System. PSLAN is a digital communications network providing connectivity for advanced technology devices situated in various areas of a passenger station, including fare control areas and station platforms.    
 
T6040407 Passenger Station Local Area Network at 8 Stations 2010-2014 This project was to install Passenger Station Local Area Network (PSLAN) infrastructure at 8 stations, which will support the rollout both of Help Points and the New Fare Payment System. PSLAN is a digital communications network providing connectivity for advanced technology devices situated in various areas of a passenger station, including fare control areas and station platforms.   This project has been deactivated. The scope and budget have been transferred to the, "Passenger Station Local Area Network at 188 Stations" project.
 
T6040408 Passenger Station Local Area Network at 20 Stations 2010-2014 This project was to install Passenger Station Local Area Network (PSLAN) infrastructure at 20 stations, which will support the rollout both of Help Points and the New Fare Payment System. PSLAN is a digital communications network providing connectivity for advanced technology devices situated in various areas of a passenger station, including fare control areas and station platforms. This project scope and budget were split-out from the "Passenger Station Local Area Network at 27 Stations" project, which is now the "Passenger Station Local Area Network at 4 Stations" project. This project has been deactivated. The scope and budget have been transferred to the, "Passenger Station Local Area Network at 188 Stations" project.
 
T6040409 Passenger Station Local Area Network at 2 Stations 2010-2014 This project will install Passenger Station Local Area Network (PSLAN) infrastructure at 2 stations (Whitehall Street and Jay Street-MetroTech Stations on the Broadway Line) which will support the rollout both of Help Points and the New Fare Payment System. PSLAN is a digital communications network providing connectivity for advanced technology devices situated in various areas of a passenger station, including fare control areas and station platforms. Budget change due to financial closeout activities.  
 
T6041202 Reserve: Station Renewal Work 2010-2014 This project provided funding for the station renewal program. Funds were transferred from this reserve to develop individual station renewal projects. Each renewal project will eliminate all the deficiencies as determined by the station condition survey at a given location. Work will vary by station but may include the repair or replacement of platforms, platform edges, mezzanines, canopies, windscreens, and stairs. Station aesthetics will also be remedied. The original budget was reduced due to a split-out of funds for various station renewal projects. As additional funding is gradually transferred to individual renewal projects for design and construction, the available balance in this project will be reduced further. This is a reserve; reduction reflects transfers of funding to individual station renewal projects for design and construction.
 
T6041206 Station Work at Pelham Bay Park on the Pelham Line 2010-2014 This project will repair select elements within the Pelham Bay Park Station on the IRT Pelham Line in the borough of the Bronx. Work will include the replacement of the platform canopies and platform edges plus installation of new tactile platform edge ADA warning strips. Some of the design for this project was started and funded in a prior capital program.    
 
T6041211 Improvements at the Dyckman Street Station on the Broadway/7th Avenue Line 2010-2014 This project will repair select elements within the Dyckman Street Station on the IRT Broadway/7 Avenue Line in the borough of Manhattan. Work will include the rehabilitation of the station platform, canopies, railings and miscellaneous items at the platform level plus other structural repairs at the station. This work is in coordination with projects to repair or replace canopies, stairs, and platform edges at other locations along the Broadway/7 Avenue Line. Some or all of the design for this project was funded in a prior capital program.    
 
T6041212 Rehabilitation of Smith-9th Station on the Culver Line 2010-2014 This project will rehabilitate the Smith-9th Streets Station on the IND Culver Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include the repair of structural deficiencies throughout the station, reconstruction of the control house, rehabilitation of the stair/escalator enclosure & platforms, and improvements to architectural treatments and lighting. This project is in coordination with the on-going Culver Viaduct replacement project. Some or all of the design for this project was funded in a prior capital program.    
 
T6041213 Rehabilitation of 20 Avenue Station on the Sea Beach Line 2010-2014 This project will rehabilitate the 20th Avenue Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include the rehabilitation of the street level control houses, tunnel structures supporting the control houses, passageway enclosures between platform stairs, concrete platform stairs and concrete enclosures, and platforms including canopy structure. In addition, station aesthetics will be remedied and artwork will be installed. Some of the design for this project was started and funded in a prior capital program. Budget was increased during construction to address additional communication, environmental and water remediation work; schedule was extended accordingly.  
 
T6041214 Rehabilitation of 8 Avenue Station on the Sea Beach Line 2010-2014 This project will rehabilitate the 8 Avenue Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include rehabilitation of the street-level control house and support structure, replacement of the concrete and metal canopy passageway enclosure between platform stairs, replacement of the mezzanine to platform stairs and canopies, and rehabilitation of platforms including canopy structure. In addition, station aesthetics will be remedied and artwork will be installed. Some of the design for this project was started and funded in a prior capital program. Budget was increased during construction to address work related to two new elevators, as well as, additional communication, environmental and water remediation work; schedule was extended accordingly.  
 
T6041215 Rehabilitation of Fort Hamilton Parkway Station on the Sea Beach Line 2010-2014 This project will rehabilitate the Fort Hamilton Parkway Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include rehabilitation of the street-level control houses and support structure, replacement of the concrete passageway enclosure between platform stairs, replacement of the platform stairs and canopies, and rehabilitation of platforms including canopy structure. In addition, station aesthetics will be remedied and artwork will be installed. Some or all of the design for this project was funded in prior capital program. Additional scope / repairs at various stations in Sea Beach contract: structural steel, fire alarms, water remediation, manhole repair, communications systems.  
 
T6041216 Rehabilitation of 18th Avenue Station on the Sea Beach Line 2010-2014 This project will rehabilitate the 18 Avenue Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include rehabilitation of the street-level control houses, rehabilitation of tunnel structures supporting the control houses, replacement of one passageway enclosure and relocation of the other, relocation of one stair, replacement of platform metal stairs and canopy, and rehabilitation of platforms. In addition, station aesthetics will be remedied and artwork will be installed. Some or all of the design for this project was funded in prior capital program. Additional scope / repairs at various stations in Sea Beach contract: structural steel, fire alarms, water remediation, manhole repair, communications systems.  
 
T6041217 Rehabilitation of Kings Highway Station on the Sea Beach Line 2010-2014 This project will rehabilitate the Kings Highway Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include rehabilitation of the street-level control houses plus the rehabilitation of the tunnel structure supporting the two control houses, the concrete platform stairs and concrete enclosures, and platforms. The station will also be rehabilitated per requirements listed on the National Register of Historic Places. In addition, station aesthetics will be remedied and artwork will be installed. Some or all of the design for this project was funded in prior capital program.    
 
T6041218 Rehabilitation of New Utrecht Avenue Station on the Sea Beach Line 2010-2014 This project will rehabilitate the New Utrecht Avenue Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include rehabilitation of the street-level control houses plus the rehabilitation of the tunnel structure supporting the two control houses, the concrete platform stairs and concrete enclosures, and platforms. The station will also be rehabilitated per requirements listed on the National Register of Historic Places. In addition, station aesthetics will be remedied and artwork will be installed. Some or all of the design for this project was funded in prior capital program. Additional scope / repairs at various stations in Sea Beach contract: structural steel, fire alarms, water remediation, manhole repair, communications systems.  
 
T6041219 Rehabilitation of Bay Parkway Station on the Sea Beach Line 2010-2014 This project will rehabilitate the Bay Parkway Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include the rehabilitation of the street level control houses, tunnel structures supporting the control houses, passageway enclosures between platform stairs, concrete platform stairs and concrete enclosures, and platforms including canopy structure. The station will also be rehabilitated per requirements listed on the National Register of Historic Places. In addition, station aesthetics will be remedied and artwork will be installed. Some of the design for this project was started and funded in a prior capital program. Additional scope / repairs at various stations in Sea Beach contract: structural steel, fire alarms, water remediation, manhole repair, communications systems.  
 
T6041220 Rehabilitation of Avenue U Station on the Sea Beach Line 2010-2014 This project will rehabilitate the Avenue U Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include the rehabilitation of the street level control houses and tunnel structures supporting the control houses, replacement of one passageway enclosure and relocation of the other passageway including structure, replacement of platform stairs and canopy, relocation of one stair, and rehabilitation of platforms including canopy structure. In addition, station aesthetics will be remedied and artwork will be installed. Some or all of the design for this project was funded in prior capital program. Budget was increased due to additional costs required during construction.  
 
T6041221 Rehabilitation of 86 St Station on the Sea Beach Line 2010-2014 This project will rehabilitate the 86 St. Station on the BMT Sea Beach Line in the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include the rehabilitation of the street level control houses, tunnel structures supporting the control houses, passageway enclosures between platform stairs, concrete platform stairs and concrete enclosures, and platforms including canopy structure. In addition, station aesthetics will be remedied and artwork will be installed. Some or all of the design for this project was funded in prior capital program. Budget was increased during construction to address additional communication, environmental and water remediation work.  
 
T6041222 Ceiling Repair at 181 St and 168 St on the Broadway-7th Av Line 2010-2014 This project will repair a brick arch section that spans the tracks and platform at the 181 Street Station on the IRT Broadway/7 Avenue Line in the borough of Manhattan. Work will include repairs to the brick arch, mosaics, and architectural ornaments. This station is listed in the National Register of Historical Places; accordingly, the repairs must be consistent with historical standards. Some of the design for this project was started and funded in a prior capital program. Additionally, similar repairs will be made at the 168 Street Station on the same line.    
 
T6041251 Replacement of Platform Edges at 3 Stations on the Eastern Parkway Line 2010-2014 This project will repair or replace the platform edges at the Hoyt St, Bergen St, and Franklin Av stations on the IRT Eastern Parkway Line in the borough of Brooklyn. Work will vary by location and may include replacement of rubbing boards, repair of structural deficiencies at the platform edge, installation of ADA compliant tactile warning strips and bringing the gap between the platform edge and train car door sills into compliance with guidelines. Some or all of the design for this project was funded in a prior capital program.    
 
T6041260 Component Repairs at 4 Stations on the Jamaica Line 2010-2014 This project will repair select station elements within the 121 Street, 111 Street, 104 Street, and Myrtle Avenue stations along the BMT Jamaica Line in the boroughs of Queens and Brooklyn. Work will vary by location and may include replacement of platform slabs and platform edges; repairs to steel columns and concrete bases; and repairs to station stairs. Budget was increased during construction to address additional steel repair work.  
 
T6041267 Component Repairs at 149 St - Grand Concourse on the Jerome Line 2010-2014 This project will repair select station elements within the 149 St - Grand Concourse station on the Jerome Line in the borough of the Bronx. Work will include repairs to platform edges and floors.    
 
T6041268 Component Repairs at 149 St - Grand Concourse on the White Plains Road Line 2010-2014 This project will repair select station elements within the 149 St - Grand Concourse station on the White Plains Road Line in the borough of the Bronx. Work will include repairs to platform floors, platform edges, and platform-to-mezzanine stairs.    
 
T6041270 Component Repairs at Vernon Blvd-Jackson Avenue on the Flushing Line 2010-2014 This project will repair or replace selected station components that are in disrepair at Vernon Boulevard-Jackson Avenue Station on the Flushing Line in the borough of Queens. Work will include repairs to street stairs, platform edges, platform floors, platform columns, and the platform/track ceiling and walls.    
 
T6041274 Component Repairs at 157 Street Station on the Broadway-7th Avenue Line 2010-2014 This project will repair deteriorated platform/track columns and beams at the 157 Street station on the Broadway-7th Avenue Line in the borough of Manhattan.    
 
T6041280 Component Repairs at 103 Street Station on the Lexington Line 2010-2014 This project will repair select station elements within the 103 St station on the Lexington Line in the borough of Manhattan. Work will include repairs to street stairs, mezzanine ceiling/walls, mezzanine floors, platform ceiling/walls, platform floors, platform edges, and platform-to-mezzanine stairs. Budget change due to financial closeout activities.  
 
T6041281 Component Repairs at 2 Stations on the Culver Line 2010-2014 This project will repair select station elements within the Avenue N and Kings Highway stations on the Culver Line in the borough of Brooklyn. Work will include repairs to the mezzanine ceiling/walls, platform columns, platform floors, platform edges, and platform-to-mezzanine stairs. Budget was later increased due to additional costs required during construction.  
 
T6041282 Component Repairs at 49 Street Station on the Broadway Line 2010-2014 This project will repair select station elements within the 49th Street station on the BMT Broadway Line in the borough of Manhattan. Work will include replacement of platform edges and street stair ceiling/passageway repair work.    
 
T6041283 Component Repairs at 2 Stations on the 4th Avenue Line 2010-2014 This project will repair select station elements within the 9th Street and 59th Street stations along the BMT 4th Avenue Line in the borough of Brooklyn. Work will vary by location and may include repairs to street stairs, mezzanine floors, and platform floors, columns, ceilings/walls and edges.    
 
T6041290 Components Repairs at 5 Stations on the Fulton Line - Design Only 2010-2014 This project will fund design activities for the repair of select station elements within the Clinton-Washington Avenue, Kingston-Throop Avenue, Ralph Avenue, Rockaway Avenue and Liberty Avenue stations along the IND Fulton Line in the borough of Brooklyn. Work will vary by location and may include replacement of platform edges; repair of platform floors; and repairs to station stairs. Construction will be addressed separately under multiple projects.    
 
T6041291 Component Repairs at 3 Stations on the Lexington Line 2010-2014 This project will repair select station elements within the 59th Street, 51st Street and Astor Place stations along the IRT Lexington Avenue Line in the borough of Manhattan. Work will vary by location and may include repairs to platform columns, ceilings/walls and platform edges. Budget change due to financial closeout activities.  
 
T6041292 Component Repairs at New Lots Avenue Station on the New Lots Line 2010-2014 This project will repair select station elements within the New Lots Avenue station along the IRT New Lots Line in the borough of Brooklyn. Work will include repair of the control house floor, walls and ceiling; replacement of windscreens; repair of platform floors; and limited station painting.    
 
T6041293 Component Repairs at 2 Stations on the Queens Boulevard Line 2010-2014 This project will repair select station elements within the 5th Avenue and 7th Avenue stations along the IND Queens Boulevard Line in the borough of Manhattan. Work will vary by location and may include repair of platform ceilings/walls, platform edges, and columns. Budget change due to financial closeout activities.  
 
T6041296 Component Repairs at President Street and Newkirk Avenue Stations on the Nostrand Avenue Line - Design Only 2010-2014 This project will fund design activities to repair select station elements within the President Street and Newkirk Avenue stations along the IRT Nostrand Line in the borough of Brooklyn. Work will include repair of platform edges and platform floors.   Budget change due to financial closeout activities.
 
T60412A4 Component Repairs at Eastchester-Dyre Avenue Station on the Dyre Avenue Line 2010-2014 This project will repair select station elements within the Eastchester-Dyre Avenue Station on the IRT Dyre Avenue Line in the borough of the Bronx. Work may include repair of the station control house roof, platforms and supporting piers.    
 
T60412B2 Component Repairs at 21st Street Station on the Crosstown Line 2010-2014 This project will repair select station components at the 21st Street Station on the IND Crosstown Line in the borough of Queens. Work may include repairs to station stairs, mezzanine and platform floors, and wall panels. The budget was reduced to the current project scope. The balance was reprogrammed per the 2019 Plan Amendment. Project is financially closed; budget reflects final cost.
 
T60412B3 Component Repairs at Greenpoint Avenue Station on the Crosstown Line 2010-2014 This project will repair select station components at the Greenpoint Avenue Station on the IND Crosstown Line in the borough of Brooklyn. Work will include repairs to street, mezzanine, and platform stairs; mezzanine and platform floors, columns, ceilings, and lighting fixtures; and track ceiling. Budget change due to financial closeout activities.  
 
T60412B6 Component Repairs at 3 Stations on the Broadway Line 2010-2014 This project will repair select station components at the Rector Street, Court Street, and Jay Street-Metro Tech Stations along the BMT Broadway Line in the boroughs of Manhattan and Brooklyn. Work will vary by location and may include repair of mezzanine/control area walls, floors, ceilings and lighting; and platform edges, floors, walls and lighting.    
 
T60412B7 Component Repairs at 2 Stations on the Broadway Line 2010-2014 This project will repair select station components at the City Hall and Whitehall Street Stations along the BMT Broadway Line in the borough of Manhattan. Work will vary by location and may include repair of stairs; platform rubbing boards, warning strips, floors, columns, and lighting fixtures; and track walls and ceilings.    
 
T60412C2 Component Repairs at Aqueduct-North Conduit Avenue on the Rockaway Line 2010-2014 This project will repair select station elements within the Aqueduct-North Conduit Avenue station on the Rockaway Line in the borough of Queens. Work will include platform canopy replacement work, light fixture replacement beyond the canopy, platform stair wall & ceiling concrete repair work, and replacement of expansion joints.   Budget was adjusted based on the costs of construction and support requirements at the time of award. Current budget change due to financial closeout activities.
 
T60412C3 Component Repairs at 2 Stations on the Canarsie Line 2010-2014 This project will repair select station elements within the Wilson Avenue and Atlantic Avenue stations along the Canarsie Line in the borough of the Brooklyn. Work will vary by location but all deficiencies of the selected components within the stations will be eliminated. Components include stairs, sidewalk roof structures, facades, platforms, and structural steel.    
 
T60412C4 Component Repairs at 3 Stations on the 8th Avenue Line 2010-2014 This project will repair select station elements within the 103rd Street, 145th Street, and 168th Street stations along the 8th Avenue Line in the borough of the Manhattan. Work will vary by location but all deficiencies of the selected components within the stations will be eliminated. This project was previously described as "Component Repairs at 7 Stations on the 8th Avenue Line". The scope and budget were reduced to split-out several new subprojects, including the "Repair of Platform Components at 50th St Lower Level on the 8th Avenue Line", "Repair of 2 Street Stairs at 23rd Street Station on the Eighth Avenue Line (SBMP)", "Repair of 2 Street Stairs at 23rd Street Station on the Eighth Avenue Line (SBMP)", "Repair of 2 Street Stairs at 23rd Street Station on the Eighth Avenue Line (SBMP)", "Repair of 2 Street Stairs at 23rd Street Station on the Eighth Avenue Line (SBMP)", "Repair of 3 Street Stairs at 23rd Street Station on the Eighth Avenue Line (SBMP)", "Repair of 1 Street Stair at 168th Street Station on the Eighth Avenue Line (SBMP)", "Repair of 1 Street Stair at 168th Street Station on the Eighth Avenue Line (SBMP)", "Repair of 2 Street Stairs at 168th Street Station on the Eighth Avenue Line (SBMP)". 110th Street Station has been deferred to the 2015-2019 Capital Program, and will be addressed as part of the Enhanced Station Initiative Program. This project will now address 3 of the original 7 locations. The schedule and budget have been updated to reflect the current work plan and latest cost estimate. The cost increase is due to constructability and right of way issues.  
 
T60412C7 Repair of 3 Street Stairs at Rector Street on the Broadway Line (SBMP) 2010-2014 This project will repair three street to platform stairs at the Rector Street station (northbound platform side) on the Broadway Line in the borough of Manhattan. Work will vary per stair and may include rehabilitation of treads, risers, walls, and other associated work. All deficiencies of the selected stairs will be eliminated. Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T60412C8 Repair of 5 Street Stairs at Rector Street on the Broadway Line (SBMP) 2010-2014 This project will repair five street to platform stairs at the Rector Street station (southbound platform side) on the Broadway Line in the borough of Manhattan. Work will vary per stair and may include rehabilitation of treads, risers, walls, and other associated work. All deficiencies of the selected stairs will be eliminated. Construction of this project is part of the MTA's small business mentoring program. Schedule adjusted to reflect current work plan. During closeout, unfinished work was split-out in a new subproject "Street Stairs at Rector Street on the Broadway Line Wrap-up (SBMP)"; the budget was transferred accordingly.  
 
T60412D4 Repair of 1 Interior Stair at 49th Street on the Broadway Line (SBMP) 2010-2014 This project will repair one mezzanine to platform stair at the 49th Street station on the Broadway Line in the borough of Manhattan. Work may include rehabilitation of treads, risers, walls, and other associated work. All deficiencies of the selected stair will be eliminated. Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T60412E4 Station Painting at Van Cortlandt Park-242 Street on the Broadway-7th Avenue Line 2010-2014 This project will paint Van Cortlandt Park-242 Street Station on the Broadway-7th Avenue Line in the borough of the Bronx. The entire station will be painted, including the canopy structure of all three platforms, the mezzanine, bridge, stairs, and guardrails.    
 
T60412F8 Repair of Platform Components at 50th St Lower Level on the 8th Avenue Line 2010-2014 This project will repair platform components at 50th Street Station on the 8th Avenue line in the borough of Manhattan. Work will include platform edge reconstruction, column base repair, beam repair, and architectural finishes. Budget reflects final cost.  
 
T60412I1 Platform Component Repairs at 2 Locations on the Jerome Line - Design Only 2010-2014 This project will fund design activities to repair select platform components at Mt Eden Avenue and 167th Street stations along the IRT Jerome Line in the borough of the Bronx. Work will include repair of platform edges, including new rubbing boards and tactile warning strips, and platform panels. Construction will be addressed in a future capital program. This project includes advanced work using temporary funds. The budget decrease reflects the restoration of those funds. This project was formerly titled "Component Repairs at 4 Locations on the Jerome Line - Design Only". Scope was reduced from 4 to 2 locations; budget reflects project scope. Delayed due to track access scheduling conflicts. Schedule updated to reflect current work plan.
 
T60412I2 Platform Edges at 167 Street on the Grand Concourse Line - Design Only 2010-2014 This project temporarily funded design activities to repair or replace the platform edges at the 167th Street station on the Grand Concourse Line in the borough of the Bronx. Interim funding has been provided to advance design needs. This project includes advanced work using temporary funds. The budget decrease reflects the restoration of those funds.
 
T60412I8 Repair of Platform Components at 7 Locations on the Canarsie Line - Design Only 2010-2014 This project temporarily funded design activities for the repair of platform components on the Canarsie line in the boroughs of Manhattan and Brooklyn.   This project includes advanced work using temporary funds. The budget decrease reflects the restoration of those funds.
 
T6041302 Improve Platform Edges at 34 St Station on the Broadway Line 2010-2014 This project will replace the ADA (Americans with Disabilities Act) warning strips and rubbing boards at the platform edges at the 34th Street Station on the BMT Broadway Line in the borough of Manhattan. Some or all of the design for this project was funded in a prior capital program.    
 
T6041303 Improve Platform Edges at 34 St Station on the 6th Av Line 2010-2014 This project will replace the ADA (Americans with Disabilities Act) warning strips and rubbing boards at the platform edges of the 34th Street Station on the IND 6th Avenue Line in the borough of Manhattan. Some or all of the design for this project was funded in a prior capital program.    
 
T6041304 Improve Horizontal and Vertical Platform Clearance at Various Locations 2010-2014 This project will improve ADA boarding zones to meet horizontal and vertical gap criteria at selected stations systemwide. Scopes per location will depend on the individual station needs.   Schedule was adjusted to allow additional time to complete field inspections and constructability reviews. Budget increase during construction due to additional platform edge work at some locations.
 
T6041318 ADA Accessibility at 8th Avenue Station on the Sea Beach Line 2010-2014 This project will provide partial ADA (Americans with Disabilities Act) accessibility at 8th Avenue Station on the BMT Sea Beach Line in the borough of Brooklyn. Work will include installation of one elevator at the northbound platform and preliminary site work at the southbound platform. Additional scope / repairs at various stations in Sea Beach contract: structural steel, fire alarms, water remediation, manhole repair, communications systems. The scope was decreased as the southbound elevator was split out as a separate project, "ADA Accessibility at 8th Avenue Station on the Sea Beach Line (Southbound)". Budget change due to financial closeout activities.
 
T6041319 ADA Accessibility at Bedford Avenue Station on the Canarsie Line - Design Only 2010-2014 This project will fund design activities to provide ADA accessibility to and from the mezzanine and platform from the street level at the Bedford Avenue Station on the Canarsie Line. This project will make the Control Area and platform fully accessible to the elderly and disabled. This project includes advanced work using temporary funds. Additional interim funding was provided to complete design. Budget change due to financial closeout activities.
 
T6041320 ADA Accessibility at 1st Avenue Station on the Canarsie Line - Design Only 2010-2014 This project will fund design activities to provide ADA accessibility at the 1st Avenue Station on the Canarsie Line. This project will make the Control Area and platform fully accessible to the elderly and disabled. This project includes advanced work using temporary funds. Additional interim funding was provided to complete design.  
 
T6041323 ADA Accessibility at 8th Avenue Station on the Sea Beach Line (Southbound) 2010-2014 This project will install an ADA (Americans with Disabilities Act) accessible elevator on the southbound platform at 8th Avenue Station on the BMT Sea Beach Line in the borough of Brooklyn. This scope was split out from the "ADA Accessibility at 8th Avenue Station on the Sea Beach Line" project. Initial funding was provided for pre-construction consultant services; as the project continues to progress, the budget will be increased to fund construction. Budget was adjusted based on the costs of construction and support requirements at the time of award.
 
T6041405 Access Improvements at Grand Central Station 2010-2014 This project will provide improved circulation at Grand Central Station on the IRT Lexington Avenue Line located in the borough of Manhattan. Work will include the construction of a new entrance stair on the west side of the 42nd Street entrance and the reconfiguration of the fare control area. Platform improvements were deleted from the scope of work and will be addressed in a future capital program. Budget was increased based on additional costs required during construction; schedule reflects current work plan.  
 
T6041408 Station Condition Survey Update 2010-2014 This project will provide an update to the station condition survey. The first survey, completed in 2008, provided the comprehensive data set used in programming select passenger station projects in the 2010 - 2014 capital program. Work will include visiting each NYCT rail station and conducting a thorough inspection of selected subcomponents, including stairs, platforms, mezzanines, windscreens, canopies, and other elements.    
 
T6041410 Platform Replacement at 45 Rd-Court House Square on the Flushing Line 2010-2014 This project will replace the platforms and provide enhanced accessibility at the 45th Road-Court House Square Station on the IRT Flushing Line in the borough of Queens. The work will include replacement of the existing platform slabs and windscreens, installation of ADA boarding areas, tactile warning strip and signage, and refurbishment of employee facilities. Some or all of the design for this project was funded in a prior capital program.    
 
T6070324 Structural Repairs at 9 Avenue Station on the West End Line 2010-2014 This project will repair/replace deteriorated steel columns and other steel members, and other ancillary work at the lower level platform area closed to the public at the 9 Avenue station on the West End line in Brooklyn. This is a multi phased project with work being performed by in-house forces and 3rd party contract. The work was awarded and completed as follows: initial in-house portion (Jul 2012 / Jan 2014); 3rd Party portion (Jun 2014 / Dec 2016); final in-house portion (Sept 2018 / Jun 2019). Budget was adjusted based on the cost of construction and support requirements at the time of award. Budget was later increased to address additional steel repairs, unforeseen field conditions and additional support costs; schedule was extended accordingly.  
 
T6080318 Modification of Signal Key-By Circuits - Phase 3 2010-2014 This project will upgrade signals locations systemwide by incorporating a signal key-by timer into the existing circuits of all automatic and approach signals at the leaving end of station platforms. Budget change due to financial closeout activities.  
 
T6080621 Passenger Station Local Area Network at 30 Stations 2010-2014 This project will install Passenger Station Local Area Network (PSLAN) infrastructure at 30 stations, which will support the rollout both of Help Points and the New Fare Payment System. PSLAN is a digital communications network providing connectivity for advanced technology devices situated in various areas of a passenger station, including fare control areas and station platforms.    
 
T6080623 Passenger Station Local Area Network at 68 Stations 2010-2014 This project will design Passenger Station Local Area Network (PSLAN) infrastructure at 68 stations, which will support the rollout both of Help Points and the New Fare Payment System. PSLAN is a digital communications network providing connectivity for advanced technology devices situated in various areas of a passenger station, including fare control areas and station platforms. Construction will be addressed separately under multiple projects. This project will also purchase an upgrade to the Solarwinds network management hardware and software system, which supports the PSLAN system. Budget change reflects financial closeout of design tasks. Schedule updated to reflect current work plan.
 
T6080640 Passenger Station Local Area Network at 3 Stations on the Crosstown Line 2010-2014 This project will install Passenger Station Local Area Network (PSLAN) infrastructure at 3 stations on the Crosstown Line: Court Square and 21 Street in the borough of Queens, and Greenpoint Avenue in the borough of Brooklyn. This infrastructure will support the rollout both of Help Points and the New Fare Payment System. PSLAN is a digital communications network providing connectivity for advanced technology devices situated in various areas of a passenger station, including fare control areas and station platforms. Budget change due to financial closeout activities; savings transferred to fund "Upgrade Access Nodes at 60 Stations" project.  
 
T6080643 Platform Screen Doors Pilot - Design Only 2010-2014 This project will fund design activities for a platform screen door pilot at the 6 Avenue Station on the Canarsie Line in the borough of Manhattan. The goal of platform screen doors is to improve customer and crew safety as well as reduce trash and debris accumulation on the trackway. This project includes advanced work using temporary funds. The budget decrease reflects the restoration of those funds.  
 
T6080651 Help Point at 90th, 103rd, and 111th Street Stations on the Flushing Line (SBMP) 2010-2014 This project will furnish and install Help Point units at 90th, 103rd, and 111th Street stations on the Flushing Line in borough of Queens. At each station, two units will be installed on each platform and one will be installed in the mezzanine area (without a full-time booth). Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T6120433 Removal of In-Ground Lifts at 5 Bus Depots 2010-2014 This project will remove all in-ground lifts and install new portable lifts at the Michael J. Quill, Fresh Pond, Jackie Gleason, Kingsbridge, and Flatbush Bus Depots. The scope and budget were reduced to split-out a new subproject, "Replacement of Vertical Platform Lift at East New York (SBMP)".  
 
T6120440 Replacement of Vertical Platform Lift at East New York (SBMP) 2010-2014 This project will install a new bus lift at the East New York Bus Depot. Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T6160213 Help Point at 233 Street and 238 Street-Nereid Avenue Stations on the White Plains Road Line (SBMP) 2010-2014 This project will furnish and install Help Point units at the 233 Street and 238 Street-Nereid Avenue stations on the White Plains Road line in borough of the Bronx. At each station, two units will be installed on each platform and one will be installed in the mezzanine area (without a full-time booth). Construction of this project is part of the MTA's small business mentoring program.    
 
T6160214 Help Point at 219 Street and 225 Street Stations on the White Plains Road Line (SBMP) 2010-2014 This project will furnish and install Help Point units at the 219 Street and 225 Street stations on the White Plains Road line in borough of the Bronx. At each station, two units will be installed on each platform and one will be installed in the mezzanine area (without a full-time booth). Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T6160222 Help Point at Bronx Park East on the White Plains Road Line and 82nd Street-Jackson Heights on the Flushing Line (SBMP) 2010-2014 This project will furnish and install Help Point units at two stations: the Bronx Park East station on the White Plains Road line in the borough of the Bronx, and the 82nd Street-Jackson Heights station on the Flushing line in borough of Queens. At each station, two units will be installed on each platform and one will be installed in the mezzanine area (without a full-time booth). Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T6160223 Help Point at 52nd Street and 69th Street on the Flushing Line (SBMP) 2010-2014 This project will furnish and install Help Point units at the 52nd Street and 69th Street stations on the Flushing line in borough of Queens. At each station, two units will be installed on each platform and one will be installed in the mezzanine area (without a full-time booth). Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T6160224 Help Point at Mosholu Parkway and Bedford Park Boulevard Stations on the Jerome Line (SBMP) 2010-2014 This project will furnish and install Help Point units at the Mosholu Parkway and Bedford Park Boulevard stations on the Jerome line in borough of the Bronx. At each station, two units will be installed on each platform and one will be installed in the mezzanine area (without a full-time booth). Construction of this project is part of the MTA's small business mentoring program. Budget change due to financial closeout activities.  
 
T7030213 Automatic Passenger Counting - Pilot & Phase 1 2015-2019 This project will develop and furnish an Automated Passenger Counting (APC) system for all buses not replaced before 2022. APC is targeted for development as an application on the Clever Devices Open IVN computer platform. Real time APC data would supplement and possibly over time reduce the requirement for manual passenger counting, improve bus schedule efficiencies, facilitate service management, and provide better data regarding fare evasion.   Due to a manufacturing defect in the harness delivered from vendor, in 2019 all kits needed to be shipped back and replaced by vendor. Completion delay due to the COVID-19 pandemic and related workforce and material delivery issues. Further delays due to manpower availability.
 
T7041209 Renewal of Mets-Willets Point Station on the Flushing Line - Design Only 2015-2019 This project will fund design activities to repair select elements within the Mets-Willets Point Station on the IRT Flushing Line in the borough of Queens. Work will include the replacement of street stairs, mezzanine to platform stairs, mezzanine floors, doors and windows, interior and exterior walls, and canopies as required. Construction will be addressed in a future capital program. This project was reduced to design only activities; construction is rescheduled to the 2020-2024 capital program. Schedule adjusted to reflect current work plan; delay due to coordination with Port Authority Airtrain project.
 
T7041222 Component Repairs at 2 Stations on the 4th Avenue Line 2015-2019 This project will repair select station elements at the 25th Street and 45th Street stations along the BMT 4th Avenue Line in the borough of Brooklyn. Work will vary by location and may include replacement of platform slabs, platform edges and repairs to track walls.    
 
T7041223 Platform Component Repairs at Kingston-Throop Avenue Station on the Fulton Line - Design Only 2015-2019 This project has been consolidated into the "Enhanced Station Initiative" project; this project will no longer be active.    
 
T7041224 Platform Component Repairs at 2 Locations on the Jerome Line - Design Only 2015-2019 This project will fund design activities to repair select platform components at Mt Eden Avenue and 167th Street stations along the IRT Jerome Line in the borough of the Bronx. Work will include repair of platform edges, including new rubbing boards and tactile warning strips, and platform panels. Construction will be addressed in a future capital program. This project was reduced to design only activities; construction is rescheduled to the 2020-2024 capital program.  
 
T7041225 Platform Component Repairs at Pelham Parkway on the Dyre Line - Design Only 2015-2019 This project has been consolidated into the "Enhanced Station Initiative" project; this project will no longer be active.    
 
T7041234 Platform Component Repairs at 167 Street on the Grand Concourse Line - Design Only 2015-2019 This project has been consolidated into the "Enhanced Station Initiative" project; this project will no longer be active.   Project is financially closed; budget reflects final cost.
 
T7041235 Repair of Platform Components at Bedford-Nostrand on the Crosstown Line 2015-2019 This project will repair platform components at Bedford-Nostrand Avenues on the IND Crosstown line in the borough of Brooklyn. Work will include platform edge reconstruction, column base repair, beam repair, and architectural finishes. Budget was adjusted based on the costs of construction and support requirements at the time of award. Budget change due to financial closeout activities.
 
T7041236 Repair of Platform Components at Longwood Avenue on the Pelham Line 2015-2019 This project will repair platform components at Longwood Avenue on the IRT Pelham line in the borough of the Bronx. Work will include platform edge reconstruction, column base repair, beam repair, and architectural finishes.   Schedule adjusted to reflect current work plan. Budget change due to financial closeout activities.
 
T7041237 Repair of Platform Components at 2 Locations on the Lenox Line 2015-2019 This project will repair platform components at two location including 148 Street-Lenox Terminal and Central Park North (110 Street) on the IRT Lenox Avenue in the borough of Manhattan. Work will include platform edge reconstruction, column base repair, beam repair, and architectural finishes. Schedule adjusted to reflect current work plan. Budget was adjusted based on the costs of construction and support requirements at the time of award.  
 
T7041238 Repair of Platform Components at 2 Locations on the Flushing Line - Design Only 2015-2019 This project will fund design activities to repair platform components at two location including Junction Boulevard and 90 Street - Elmhurst Avenue on the Flushing line in the borough of Queens. Work will include platform edge reconstruction, column base repair, beam repair, and architectural finishes. Construction will be addressed in a future capital program. This project was reduced to design only activities; construction is rescheduled to the 2020-2024 capital program. Budget change due to financial closeout activities.
 
T7041246 Repair of Platform Components at 4 Locations on the Queens Boulevard and Archer Lines - Design Only 2015-2019 This project will fund design activities to repair select platform components at the 46 Street, Steinway Street and 36 Street stations on the IND Queens Boulevard Line, and Jamaica Center-Parsons on the IND Archer Line. Stations are all located in the borough of Queens. Work will include replacement of platform edges and rubbing boards. Construction will be addressed in a future capital program. This project was reduced to design only activities; construction is rescheduled to the 2020-2024 capital program.  
 
T7041250 Repair Platform Components at 2 Locations on the Nassau Loop - Design Only 2015-2019 This project was for design activities to repair select station elements at 2 locations on the BMT Nassau Loop in Manhattan. Locations include Bowery Station and Canal Street Station. This project was reprogrammed per the 2019 Plan Amendment.  
 
T7041251 Repair of Platform Components at 5 Locations on the Canarsie Line 2015-2019 This project will repair select station elements at 5 locations on the BMT Canarsie Line in Manhattan and Brooklyn. Locations include 6 Avenue Station, Morgan Avenue Station, DeKalb Avenue Station, Halsey Street Station, and Bushwick Avenue-Aberdeen Street Station. Work will vary by location and may include replacement of platform slabs, platform edges and repairs to track walls. Some of the construction for the 6 Avenue work is funded in a future capital program. Scope was reduced from 6 to 5 locations; budget was updated accordingly. This is a multi contract project, including 4 locations which were completed in August 2020 for $17.4 million, and 6 Avenue station which was awarded in December 2021. The 6 Avenue station work is primarily funded in the 2020-24 capital program - see project "Platform Components: 6 Avenue on the Canarsie Line".
 
T7041252 Repair of Platform Components at 3 Locations on the Eastern Parkway and Clark Street Lines 2015-2019 This project will repair select station elements at 3 locations on the IRT Eastern Parkway Line and Clark Street Line in Brooklyn. Locations include Clark Street Station on the Clark Street Line and Hoyt Street and Nevins Street Stations on the Eastern Parkway Line. Work will vary by location and may include replacement of platform slabs, platform edges and repairs to track walls.    
 
T7041260 Repair of Platform Components at 2 Locs on the Queens Boulevard Line - Design Only 2015-2019 This project will fund design activities to repair select station elements at 2 locations on the IND Queens Boulevard Line in Queens. Locations include 63 Drive-Rego Park and 75 Avenue. Work will vary by location and may include replacement of platform slabs, platform edges and repairs to track walls. Budget change due to financial closeout activities.  
 
T7041261 Repair Platform Edges at 2 Locations on the Queens Boulevard Line - Design Only 2015-2019 This project will fund design activities to repair or replace the platform edges at 2 locations on the IND Queens Boulevard Line in Queens. Locations include 169 Street Station and Sutphin Boulevard. Work will vary by location and may include replacement of rubbing boards, repair of structural deficiencies at the platform edge, installation of ADA compliant tactile warning strips and bringing the gap between the platform edge and train car door sills into compliance with guidelines. Budget change due to financial closeout activities.  
 
T7041263 Platform Component Repairs at 3 Locations on the Nostrand Avenue Line 2015-2019 This project will repair select station elements at 3 locations on the IRT Nostrand Line in Brooklyn. Locations include President Street Station, Sterling Street Station and Winthrop Street Station. Work will vary by location and may include replacement of platform slabs, platform edges and repairs to track walls. Budget was adjusted based on the costs of construction and support requirements at the time of award.  
 
T7041265 Repair Platform Components at 2 Locations on the Brighton Line - Design Only 2015-2019 This project was for design activities to repair select station elements at 2 locations on the BMT Brighton Line in Brooklyn. Locations include Parkside Avenue and Beverly Road. This project was reprogrammed per the 2019 Plan Amendment.  
 
T7041266 Repair Platform Components at 8 Locations on the 8 Avenue Line - Design Only 2015-2019 This project was for design activities to repair select station elements at 8 locations on the IND 8 Avenue Line in Brooklyn and Manhattan. Locations include Dyckman St-200 Street, 190 Street, 175 Street, 116 Street, 42 St-Port Authority Bus Terminal, West 4 Street, Spring Street, and High St-Brooklyn Bridge. This project was reprogrammed per the 2019 Plan Amendment.  
 
T7041267 Repair Platform Components at 5 Locations on the Broadway-7 Avenue Line - Design Only 2015-2019 This project will fund design activities to repair select station elements at 5 locations on the IRT Broadway-7 Avenue Line. Locations include 50 Street, 79 Street, 86 Street, 145 Street and 191 Street. Work will vary by location and may include replacement of platform slabs, platform edges and repairs to track walls. Construction will be addressed in a future capital program. This project was reduced to design only activities; construction is rescheduled to the 2020-2024 capital program. Scope was reduced from 10 to 5 locations.
 
T7041276 Repair Platform Components at 4 Locations on the 6 Avenue and East 63 Street Lines - Design Only 2015-2019 This project will fund design activities to repair select station elements at 4 locations on the IND 6 Avenue and East 63 Street Line. Locations include Roosevelt Island Station, 2 Avenue Station, East Broadway Station, and Bergen Street Station. Work will vary by location and may include replacement of platform slabs, platform edges and repairs to track walls.    
 
T7041277 Repair Platform Components at 6 Locations on the Lexington Avenue Line - Design Only 2015-2019 This project was for design activities to repair select station elements at 6 locations on the IRT Lexington Avenue Line in Manhattan. Locations include 68 Street, 59 Street, 14 St-Union Square, Spring Street, Brooklyn Bridge, and Wall Street. This project was reprogrammed per the 2019 Plan Amendment.  
 
T7041278 Repair Platform Edges at Freeman Street on the White Plains Road Line 2015-2019 This project will repair the platform edges at Freeman Street Station on the IRT White Plains Road Line in the borough of the Bronx. Work will include replacement of rubbing boards, repair of structural deficiencies at the platform edge, installation of ADA compliant tactile warning strips and bringing the gap between the platform edge and train car door sills into compliance with guidelines. Budget was adjusted based on the costs of construction and support requirements at the time of award.  
 
T70412A6 Repair of Platform Components at 125 Street on the Broadway-7 Avenue Line 2015-2019 This project was to repair platform components at 125 Street Station on the IRT Broadway-7 Avenue line in the borough of the Bronx. Work may include platform edge reconstruction, column base repair, beam repair, and architectural finishes. This project has been rescheduled to the 2020-2024 capital program.  
 
T70412D2 Enhanced Station Initiative: Package 4 - 28 Street on the Lexington Avenue Line 2015-2019 This project will develop and implement specific station enhancements targeted to improve the station environment and customer experience at 28 Street on the Lexington Avenue Line in Manhattan. Work will address station finishes, lighting, wayfinding and connectivity. Original procurement was re-issued due to high bids. further delayed due to additional steel work required; contract for all 5 stations actual completion 4/5/19. Budget increase due to additional work identified during construction, including replacement of platform edges, replacement of transit wireless system, and additional waterproofing and steel repairs.  
 
T70412I1 Platform Structural Repairs at 14 St-Union Square Station on the Canarsie Line 2015-2019 This project will repair structural defects at the platform level at 14 Street-Union Square Station on the Canarsie Line in the borough of Manhattan. Work will include repairs to damaged or corroded columns and beams at the track wall and on the platform. Budget was adjusted based on the costs of construction and support requirements at the time of award.  
 
T70412I9 Platform Component Repairs at Neptune Ave on the Culver Line - Design Only 2015-2019 This project will provide design funding for platform component repairs at Neptune Ave on the Culver Line. Construction will be addressed in a future capital program.   Schedule updated to reflect current work plan.
 
T70412L2 Platform Component Repairs at 14th Street on the 6th Avenue Line 2015-2019 This project will repair platform components at 14 Street Station on the IND 6th Avenue Line in the borough of Manhattan. Work may include platform edge reconstruction and column repairs. Some of the construction for this project is funded in a future capital program. This project was added per the 2019 Plan Amendment in coordination with Fast Forward ADA accessibility upgrades at this station. Schedule updated to reflect current work plan; additional time required due to contract packaging, procurement process and COVID-19 pandemic. Budget was adjusted based on the costs of construction and support requirements at the time of award. Some of the construction for this project is funded in the 2020-24 capital program - see project "Platform Components: 14 Street on the 6 Avenue Line".
 
T7041301 ADA Accessibility at Bedford Avenue Station on the Canarsie Line 2015-2019 This project will provide ADA accessibility to and from the mezzanine and platform from the street level at the Bedford Avenue Station on the Canarsie Line. This project will make the Control Area and platform fully accessible to the elderly and disabled. In addition, select work on the track wall tiles will be addressed. Budget was reduced to splitout the "Station Enhancements on the Canarsie Line" project.  
 
T7041312 ADA Accessibility at 1st Avenue Station on the Canarsie Line 2015-2019 This project will provide full ADA (Americans with Disabilities Act) accessibility at the 1st Avenue Station on the Canarsie Line. This project will make the Control Area and platform fully accessible to the elderly and disabled. Budget was reduced to splitout the "Station Enhancements on the Canarsie Line" project.  
 
T7041320 ADA Accessibility at Court Square Station on the Crosstown Line - Stair Phase 2015-2019 This project will enhance platform stair capacity on the G-train at Court Square Station, IND Crosstown Line, in the borough of Queens. Work is being performed in anticipation of the Canarsie Tube shutdown for Sandy repairs. The scope will include construction of two new platform stairs, as well as, alteration of three existing platform stairs.    
 
T7041416 Circulation Improvements at Union Square on the Canarsie Line 2015-2019 This project will improve the passenger circulation at Union Square Station on the Canarsie Line. A new escalator will be installed from the east mezzanine to the platform on the Canarsie Line. The stairs from the Broadway line to the Canarsie line will also be modified. Budget was adjusted based on the costs of construction and support requirements at the time of award.  
 
T7041418 Station Capacity Enhancements at Metropolitan Avenue on the Crosstown Line 2015-2019 This project will reopen the previously closed stair P-11 from mezzanine to platform at the Metropolitan Avenue Station on Crosstown line in the borough of Brooklyn. Budget was adjusted based on the costs of construction and support requirements at the time of award.  
 
T7041419 Station Capacity Enhancements at Broadway Junction on the Jamaica Line 2015-2019 This project will address select passenger capacity improvements at Broadway Junction on the Jamaica Line in Brooklyn. Work will include installation of two additional platform stairs; reconstruction of two existing stairs; modification of the mezzanine; and reconfiguration of station facilities. Budget updated to reflect latest estimate. Budget change due to financial closeout activities.
 
T7041420 Station Capacity Enhancements at Marcy Avenue on the Jamaica Line 2015-2019 This project will address select passenger capacity improvements at Marcy Avenue on the Jamaica Line in Brooklyn. Work will include reconstruction and widening of the Havermeyer street stairs; widening the platform level fare control areas to accommodate an additional low turnstile; and widening the westerly out-bound platform. Budget updated to reflect latest estimate.  
 
T7041422 Station Capacity Enhancements at Main St on the Flushing Line 2015-2019 This project will provide circulation enhancements by adding new street and platform access stairs at Main St station on the Flushing Line in Queens. Initial funding was for design; additional funding was allocated for the full project cost based on the latest estimate. Schedule updated to reflect current work plan; additional time required for contract packaging and procurement process. Budget was adjusted based on the costs of construction and support requirements at the time of award.
 
T7041424 Access Improvements: Grand Central-42nd Street on the Flushing Line - Center Core East - Design Only 2015-2019 This project will fund design activities to add a new stair and extend the passageway to the center of the platform of the Flushing Line station at the Grand Central-42nd Street complex in the borough of Manhattan. Construction will be addressed in a future program.   Schedule updated to reflect current work plan.
 
T7041425 Access Improvements: Grand Central-42nd Street on the Flushing Line - Stairs PL8/PL9 - Design Only 2015-2019 This project will fund design activities to widen stairs PL8/PL9 at the east end of the platform of the Flushing Line station at the Grand Central-42nd Street complex in the borough of Manhattan. Construction will be addressed in a future program.   Budget increase for additional design services. Schedule updated to reflect current work plan.
 
T7041426 Access Improvements: Grand Central-42nd Street on the Lexington Avenue Line - Stairs U2/U6 - Design Only 2015-2019 This project will fund design activities to make improvements to stairs U2 & U6 at the Grand Central-42nd Street complex in the borough of Manhattan, which connect the northbound platform on the Lexington Avenue Line and the passageway to the Flushing Line. Construction will be addressed in a future program.   Schedule updated to reflect current work plan.
 
T7041432 Reconstruct Cortlandt Street Station: Outstanding Work 2015-2019 This project will provide for outstanding work to be performed by the PANYNJ on behalf of the MTA. Work will include two platform to street stairs (stairs H and J), expansion joint adjacent to the stairs, new station storage room and vestibule area. This project was split out from the "Reconstruct Cortlandt Street Station - Broadway-7th Avenue Line" project.  
 
T7070329 Structural Repairs of the LIRR Underpass at 8th Avenue Station on the Sea Beach Line 2015-2019 This project will repair selected structural defects on the Long Island Rail Road underpass structure supporting the NYCT tracks and platform structure in the vicinity of 8th Avenue Station on the Sea Beach Line in Brooklyn. The work includes addressing steel defects, concrete defects and water infiltration. Additional funding provided for design activities. Additional funding was allocated from the "Reserve: Line Structure Component Repair Program" project; budget was adjusted based on the costs of construction and support requirements at the time of award. Project is financially closed; budget reflects final cost.
 
T7080323 Modification of Signal Key-By Circuits - Phase 4 2015-2019 This project will upgrade signal locations systemwide by incorporating a signal key-by timer into the existing circuits of automatic and approach signals at the leaving end of station platforms.   In-house staff was diverted to Subway Action Plan (SAP) work - anticipate to restart work for completion by 2021.
 
T7080618 Platform Safety Technology Rollout 2015-2019 This project will study and develop platform safety technology pilots. The goal is to improve customer and crew safety as well as reduce trash and debris accumulation on the trackway. Due to coordination issues the platform screen door pilot at 3rd Avenue on the Canarsie Line was canceled. Budget reduced accordingly. Budget change due to financial closeout activities.
 
T7080637 Connection-Oriented Ethernet (COE), Physical Security Information Management (PSIM) on Blade Servers 2015-2019 This project will increase the resiliency of the computing platform for Electronic Security System (ESS) Applications at 130 Livingston Plaza and the Rail Control Center facilities to ensure data is protected from failure during normal and emergency operations. Schedule adjusted to reflect current work plan; award delay following decision to perform work with in-house resources. Budget was adjusted based on the costs of construction and support requirements at the time of award. Current budget change due to financial closeout of design activities. Schedule updated to reflect current work plan; completion delay due to software issues, microchip supply chain delays and manpower issues.
 
T7120313 Depot Modification for Articulated Buses at Jackie Gleason Depot (SBMP) 2015-2019 This project will install a new vertical platform lift at the chassis cleaning area at Jackie Gleason Bus Depot in Brooklyn; the replacement lift will accommodate articulated buses. Construction of this project is part of the MTA's small business mentoring program.    
 
T7130210 Installation of Track Inspection Car Platform Measuring and Video Recording System 2015-2019 This project will install new track component video systems and platform measuring laser scanner on NYCT's Track Inspection Car to provide a continuous and accurate inspection of the platform edges and allow to compute accurate distances between the tracks and the platform edges for inspection of the mainline tracks.    
 
T8041203 Plat, Mezz, & Interior Stair Comps: ADA Locations 2015-2019 This project was a reserve to fund projects to repair select station components in conjunction with accessibility work at various stations systemwide. Work will vary by location and may include repair / replacement of components such as floors, columns, and wall tiles in platform, mezzanine, and interior stair areas. Budget decrease reflects "right-sizing" of project budgets for remaining component work. This is a reserve; reduction reflects transfers of funding to individual projects, including "Platform Components: Broadway Junction on the Jamaica Line" and "Platform Components: New Lots Avenue on the New Lots Line".
 
T8041204 Platform Components: Various Locations 2015-2019 This project is a reserve that will fund projects to repair select platform components at various stations systemwide. Work will vary by location and may include repair / replacement of components such as platform floors, columns, wall tiles, and edges.   This is a reserve; reduction reflects transfers of funding to individual projects, including "Station Components Design" and "Station Components: 43 Locations, Phase 1".
 
T8041206 Small Business Mentoring Program - Stations 2015-2019 This project funds the Stations portion of NYC Transit's investment in the MTA's Small Business Mentoring Program. The funds budgeted are being progressively committed through various SBMP projects over the course of the Capital Plan. This is a reserve; reduction reflects transfers of funding to individual projects, including "Platform & Stair Components: Various Locations on the Flushing Line". To date, 80 SBMP contracts have been awarded, in NYC Transit's 2020-2024 Stations program, totaling $105.0 million.
 
T8041208 Misc. Station Component/Renewal Work 2015-2019 This project is a reserve and will fund projects that will repair select station elements at various stations systemwide. Work will vary by location and may include repair / replacement of components such as floors, columns, and wall tiles in various stair areas. This is a reserve; reduction reflects transfers of funding to individual projects, including "Station Renewal: 61 Street-Woodside on the Flushing Line", "Platform Components: 137 Street on the Broadway-7 Avenue Line", "Station Renewal: 111 Street on the Flushing Line", "Station Renewal: 103 Street-Corona Plaza on the Flushing Line", "Station Renewal: 82 Street-Jackson Heights on the Flushing Line", "Station Renewal: 69 Street on the Flushing Line", "Station Renewal: 52 Street on the Flushing Line", "Platform Components: 111 Street on the Flushing", "Platform Components: 2 Locations on the Queens Boulevard Line", "Station Components Design", "Platform Edges: 2 Locations on the Jamaica Line", "Station Renewal: 85 Street-Forest Parkway on the Jamaica Line", "Station Renewal: 75 Street-Elderts Lane on the Jamaica Line", "Station Renewal: Cypress Hills on the Jamaica Line", "Platform Components: 5 Locations on the Broadway-7 Avenue Line", "Art at Other Stations". The net decrease is based on the latest estimates, bids received, and remaining locations of work. This is a reserve; reduction reflects transfers of funding to individual projects, including "Station Components: 46 Street-Bliss Street on the Flushing Line" and "Track Wall Tiles at 14 Street on the Broadway-7 Avenue Line".
 
T8041213 Station Components: Main Street on the Flushing Line 2015-2019 This project will repair select station components at the Main Street station on the Flushing line. Work will address all deficiencies in the public area of the station. The work is contractually combined with station circulation enhancements at the same location which are funded in a prior capital program. This project was split out from the "Platform Components: Various Locations" and "Small Business Mentoring Program - Stations" projects. Initial funding was provided for Main St station; additional funding for other locations will be transferred accordingly.  
 
T8041215 Station Components Design 2015-2019 This project is a design reserve that will fund in-house and consultant services for the coordination and preparation of master plans and design-build packages for all station component projects in the passenger stations category. Construction will be addressed under separate projects. This project was split out from various projects, including "Plat, Mezz, & Interior Stair Comps: ADA Locations", "Platform Components: Various Locations" and "Misc. Station Component/Renewal Work". Initial funding was provided for a limited number of locations; additional funding for other locations will be transferred accordingly. Budget increase reflects additional funding allocated for design to support the station component program.
 
T8041216 Platform Components: East Broadway on the 6 Avenue Line 2015-2019 This project will repair select platform components at East Broadway station on the 6th Avenue Line. Work may include repair / replacement of components such as platform floors, columns, and edges.   Schedule updated to reflect current work plan.
 
T8041217 Platform Components: 2 Locations on the Queens Boulevard Line 2015-2019 This project will repair select platform components at 2 stations, 36 St and 46 St, on the Queens Boulevard line in Queens. Budget was adjusted based on the costs of construction and support requirements at the time of award; funding was split out from the "Misc. Station Component/Renewal Work" project. Schedule updated to reflect current work plan.
 
T8041218 Platform Components: 5 Locations on the Broadway-7 Avenue Line 2015-2019 This project will repair select platform components at 5 stations on the Broadway-7 Ave Line, including 50 St, 79 St, 86 St, 145 St and 191 St. Work will vary by location and may include repair / replacement of components such as platform floors, columns, wall tiles, and edges.    
 
T8041225 Platform Components: 68 St - Hunter College on the Lexington Avenue Line 2015-2019 This project will repair select platform components at 68 St - Hunter College station on the Lexington Ave line in Manhattan. The work will be contractually combined with accessibility improvements at the same location.    
 
T8041227 Platform Components: 137 Street on the Broadway-7 Avenue Line 2015-2019 This project will repair select platform components at 137 Street station on the Broadway-7 Avenue line in Manhattan. The work will be contractually combined with accessibility improvements at the same location.    
 
T8041229 Platform Components: 6 Avenue on the Canarsie Line 2015-2019 This project will repair select platform components at 6 Ave station on the Canarsie line in Manhattan. The work is contractually combined with accessibility improvements at the same location. Some of the design and construction for this project was funded in a prior capital program.    
 
T8041230 Platform Components: 14 Street on the 6 Avenue Line 2015-2019 This project will repair select platform components at 14 St station on the 6 Ave line in Manhattan. The work is contractually combined with accessibility improvements at the same location. Some of the design and construction for this project was funded in a prior capital program.    
 
T8041231 Platform Components: Metropolitan Ave on the Crosstown Line 2015-2019 This project will repair select platform components at Metropolitan Ave station on the Crosstown line in Brooklyn. The work is contractually combined with accessibility improvements at the same location.   Schedule updated to reflect current work plan; completion delay due to real estate and utility issues. Budget increased during construction to perform additional platform girder repair work.
 
T8041234 Platform Components: Broadway Junction on the Jamaica Line 2015-2019 This project will repair select platform components at Broadway Junction station on the Jamaica Line. The work is contractually combined with accessibility improvements at the same location. This project was split out from the "Plat, Mezz, & Interior Stair Comps: ADA Locations" project.  
 
T8041236 Grand Central: Widening Stairs U2/U6 on the Lexington Line - Design Only 2015-2019 This project is for the design to demolish the existing U2 and U6 stairways and construct new wider stairways to improve passenger circulation from the northbound Lexington Line platform down to the Flushing Line passageway. Construction will be addressed under a separate project.    
 
T8041237 Platform Screen Doors Pilot 2015-2019 This pilot project consists of design-build activities to develop, furnish, install, and maintain Platform Screen Doors (PSD) at multiple locations to be determined. Budget increase based on the latest scope and estimate. Schedule updated to reflect current work plan; additional time required for procurement activities.
 
T8041238 Station Components: 43 Locations, Phase 1 2015-2019 This project will address design and pre-construction activities for platform component work at 43 locations systemwide. This project was split out from the "Platform Components: Various Locations" project.  
 
T8041239 Grand Central: Center Core East on the Flushing Line 2015-2019 This project will construct a new stair and a new passageway from the station platform to link to the existing center mezzanine passageway.    
 
T8041240 Grand Central: Widening Stairs U2/U6 on the Lexington Line 2015-2019 This project will demolish the existing U2 and U6 stairways and construct new wider stairways to improve passenger circulation from the northbound Lexington Line platform down to the Flushing Line passageway.    
 
T8041249 Platform Edges: 2 Locations on the Jamaica Line 2015-2019 This project will address outstanding platform edge work at 104 Street and 121 Street stations on the Jamaica line in Queens.   Schedule updated to reflect current work plan; completion delay due to track access coordination.
 
T8041256 Platform Components: New Lots Avenue on the New Lots Line 2015-2019 This project will repair select platform components at New Lots Avenue station on the New Lots Line. The work is contractually combined with accessibility improvements at the same location. This project was split out from the "Plat, Mezz, & Interior Stair Comps: ADA Locations" project.  
 
T8041262 Platform Components: 111 Street on the Flushing Line 2015-2019 This project will repair select platform components at 111 Street station on the Flushing line in Queens. The work will be contractually combined with station renewal improvements at the same location.    
 
T8041303 ADA Accessibility at Dyckman Street (northbound) on the Broadway-7 Avenue Line 2015-2019 This project will provide partial ADA (Americans with Disabilities Act) accessibility to the northbound platform at Dyckman Street station on the Broadway-7 Avenue Line in Manhattan.   Schedule updated to reflect current work plan; completion delay due to real estate and utility issues.
 
T8041313 ADA Accessibility at Avenue H Station (northbound) on the Brighton Line 2015-2019 This project will provide full ADA (Americans with Disabilities Act) accessibility at Avenue H station on the Brighton Line in Brooklyn. Work will include an ADA compliant ramp to the northbound platform.    
 
T8120402 Miscellaneous Depot Investments 2015-2019 This project is a reserve to fund the continued investment in miscellaneous depot equipment, including bus lifts and facility elevators. This is a reserve which reflects transfers of funding to individual projects, including "Depot Improvements Design" and "Articulated Chassis Wash and Platform Lift Replacement at Ulmer Park Depot (SBMP)". The net increase reflects additional funding for depot investments currently in construction. This is a reserve; reduction reflects transfers of funding to individual projects, including "Portable Bus Lift / Equipment Replacement" and "Bus Radio System (Additional Support)".
 
T8120404 Articulated Chassis Wash and Platform Lift Replacement at Ulmer Park Depot (SBMP) 2015-2019 This project will upgrade the existing chassis wash and platform lift to accommodate articulated buses. Construction of this project is part of the MTA's small business mentoring program.   Schedule updated to reflect current work plan.
 
U7030213 Replacement of Chassis Wash and Platform Lift at College Point Depot (SBFP) 2015-2019 This project will replace the chassis wash and platform lift at College Point Depot, located in Queens. Construction of this project is part of the MTA's Small Business Federal Program.   Location was changed. Budget and schedule were updated to reflect the cost and work plan at the time of award.
 
Doors
D601BW97 Concrete repairs at the Bronx anchorage of the Bronx-Whitestone Bridge 2010-2014 Under this project, the concrete anchorage on the Bronx side of the Bronx Whitestone Bridge will be waterproofed and concrete repairs will be performed as needed. Additionally, the doors at ground level on both the Bronx and Queens anchorages will be rehabilitated, and dehumidification systems will be installed in the anchorages. Contract Start delayed to coordinate with completion of the Deck Replacement - Elevated and On Grade Approach (Bronx Approach). The budget reflects a favorable construction bid.  
 
ED040201 Restoration of Throgs Neck Bridge Tower Base Lighting after Super Storm Sandy 2010-2014 This project includes repairs to eight roll down garage doors, replacement of all tower floodlights at both tower fenders, repairs to damaged grating at the Bronx fender and installation of a pile cap on the missing pile of the middle dolphin on the east side of the Queens anchorage. Dates not shown due to project being advanced in operating budget.   Project superseded. This initiative was accomplished in the operating budget.
 
ED050221 Restoration of Hugh Carey Tunnel Ventilation Buildings after Super Storm Sandy 2010-2014 This project includes repair of flood damage at the Manhattan Blower Building (MBB) and the Governors Island Vent Building (GIVB), including the GIVB elevator, electrical systems, unit heaters, gas monitoring systems, standpipe system, damper doors, hatches and a bus duct in the sublevels area. It also includes repair of soil erosion caused by flood waters.   The updated budget reflects the current EAC. Damage in the Vent Building was limited to electrical and mechanical items related to tunnel operations and included in ED040203. Project substantially complete March 2018.
 
ET040303 Mitigation: South Ferry Near-Term Flood Protection 2010-2014 This project will install flood mitigation measures to protect South Ferry Terminal from potential flooding due to severe storms. Work will include protection of entrances, hatches, ventilation louver, ventilation gratings, manholes, doors and elevator. Interior flood protection elements will include back-flow preventers and a temporary pumping system.    
 
ET040307 Mitigation: Lower Manhattan Flood Doors/Hatches (SBFP) 2010-2014 This project will mitigate a non-public entrance corridor at the Old South Ferry Loop station, as well as, the escalator machine room at the Bowling Green station, to make them less vulnerable to flooding. Protection measures include waterproof doors/bulkheads and waterproof hatches. This project is part of the MTA's small business federal mentoring program (SBFP). The project scope and budget were reduced to establish a separate subproject, "Mitigation: Lower Manhattan Flood Doors/Hatches at Bowling Green Station on the Lexington Line". Current budget change due to financial closeout activities.  
 
ET040313 Mitigation: Stair Covers/Marine Doors at Subway Station Entrances in Lower Manhattan (SBFP) 2010-2014 This project will furnish and install flood protection measures at 2 subway stations in Lower Manhattan. Measures include stair covers and marine doors at Whitehall St. Station on the BMT Broadway Line and Bowling Green Station on the IRT Lexington Avenue Line. This project is part of the MTA's small business federal mentoring program (SBFP). Current budget change due to financial closeout activities.  
 
ET040316 Mitigation: Stair Cover/Marine Doors at Subway Station Entrances in Lower Manhattan 2010-2014 This project will furnish and install flood protection measures at 3 subway stations in Lower Manhattan. Work to be performed at the following stations: Broad Street station on the Nassau Loop, Rector Street station on the Broadway Line, and Rector Street station on the 7th Avenue-Broadway Line. Measures will include flood doors and erectable barriers.    
 
ET040320 Mitigation: Critical Room Resiliency 2010-2014 This project will provide flood protection measures at critical facilities within stations. Flood protection measures will include waterproof doors and mechanical closure devices to keep coastal storm flooding from entering the system. Budget was adjusted based on costs of construction and support requirements at time of award.  
 
ET040322 Mitigation: Street Level Openings 2010-2014 This project will furnish and install flood protection measures at subway station public stairwells vulnerable to flooding during a major storm event. Flood protection measures will include waterproof doors and mechanical closure devices to keep coastal storm flooding from entering the system. Additional funding was provided for design and construction. The schedule and budget were adjusted based on the work plan and costs of construction and support requirements at the time of award.  
 
ET040324 Mitigation: Internal Station Hardening at 7 Stations 2010-2014 This project will install flood protection measures to protect critical facilities within 7 stations in lower Manhattan that are vulnerable to flooding during a major storm event. Work may include mitigation of flooding of communication and signal rooms with water-tight doors and sealing of any opening or penetration to prevent water leakage. Locations include: Canal St Station on the IRT-7th Avenue line; Canal St Station on the IND- 8th Avenue line; Canal St Station Upper level on the BMT- Broadway line; Canal St Station Lower level-Complex on the BMT- Broadway line; Canal St Station-Complex on the Nassau Loop; Canal St Station-Complex on the Lexington Ave line; and Franklin St Station on the IRT- 7th Avenue line.    
 
ET040325 Mitigation: Internal Station Hardening 2010-2014 This project will develop an effective flood mitigation scheme to protect stations, infrastructure and equipment from flooding conditions. Work may include mitigation of flooding of communication and signal rooms with water-tight doors and sealing of any opening or penetration to prevent water leakage. Additional pre-engineering funding was provided to complete the master plan and finalize the alternate for design. Schedule adjusted to reflect current work plan. Additional funding was provided for design and construction; budget reflects updated project estimate.  
 
ET040328 Mitigation: Street Level Openings at 9 Stations 2010-2014 This project will furnish and install flood protection measures at 9 subway station in Queens and Brooklyn vulnerable to flooding during a major storm event. Flood protection measures may include waterproof doors, hatches, flex gates, manhole covers and mechanical closure devices to keep coastal storm flooding from entering the system. Locations to include: Flushing Ave, Broadway, Metropolitan Ave, Nassau Ave, on IND-Crosstown Line, Brooklyn; 21st St, Court Square, on IND-Crosstown Line, Queens; Lorimer St, on BMT-Canarsie Line, Brooklyn; Vernon Blvd-Jackson Ave, on IRT-Flushing Line, Queens; Court Squ-23rd St, on IND-Queens Line, Queens. Additional funding was provided for design and construction. The schedule and budget were adjusted based on the work plan and costs of construction and support requirements at the time of award. Budget was adjusted to reflect costs initially incurred in the core program. Completion date adjusted to reflect current project schedule. Budget change due to financial closeout activities.
 
ET040329 Mitigation: Internal Station Hardening at 3 Stations 2010-2014 This project will install flood protection measures to protect critical facilities within 3 stations in Manhattan that are vulnerable to flooding during a major storm event. Work may include mitigation of flooding of communication and signal rooms with water-tight doors and sealing of any opening or penetration to prevent water leakage. Locations include: Houston St on the Broadway 7th Ave line, 103 St and 110 St on the Lexington line.   Budget change due to financial closeout activities.
 
ET040332 Mitigation: Lower Manhattan Flood Doors/Hatches at Bowling Green Station on the Lexington Line 2010-2014 This project will furnish and install flood protection at the stair entrance to the Bowling Green Station Head House on the Lexington Line. The featured protection is a retractable tension fabric barrier, known as a Flexgate. This project was split-out from the "Mitigation: Lower Manhattan Flood Doors/Hatches (SBFP)" project. Additional funding was provided from the "Mitigation Reserve: Sealing System Openings from Floodwaters" project. Budget change due to financial closeout activities.
 
ET040334 Mitigation: Internal Station Hardening -148 St Comm Rm 2010-2014 This project will provide flood mitigation measures at 148 St-Lenox Terminal communications room. Work may include water-tight doors, equipment relocation, and sealing of any opening or penetration to prevent water leakage. Initial funding was provided for design; as the project continues to progress, the budget will be increased to fund construction. Budget was adjusted based on the costs of construction and support requirements at the time of award. Current budget change due to financial closeout activities.
 
ET060305 Mitigation: 17 Fan Plants and Adjacent Tunnels 2010-2014 This project will provide flood mitigation measures for 17 fan plants and adjacent tunnels (building or hatch entrances, ventilators, emergency exits, critical room doors/openings/ vents etc.) in Manhattan, Roosevelt Island, Brooklyn, Queens and the Bronx. Additional funding was provided for design and construction. The schedule and budget were adjusted based on the work plan and costs of construction and support requirements at the time of award. Budget was later increased due to additional costs required during construction. Budget change due to financial closeout activities. In addition, funding was transferred to establish the "Mitigation: 17 Fan Plants Wrap-up (2 Locations)" project.
 
ET060306 Mitigation: Above-Grade Surface Protection at 6 Fan Plants 2010-2014 This project will provide near term protection of 6 above ground fan plant structures located in Manhattan, Queens and Brooklyn that are vulnerable to coastal storm flooding. Work includes both permanent replacements (e.g. flood doors), and deployable elements (e.g. stop logs) which are put in place only in advance of a storm.    
 
ET060325 Mitigation: 1 Fan Plant 2010-2014 This project will provide long term resiliency measures at South Ferry Fan Plant on the Lexington Line in Manhattan. Work is part of an initiative to address critical fan plants across the system that are vulnerable to coastal storm flooding. Mitigation measures may include, but are not limited to, the following: structural improvements and/or reconstruction of penthouse and vent shaft, installation of watertight doors, and electrical system modifications. Additional funding was provided for construction; budget reflects updated project estimate. Budget change due to financial closeout activities.
 
ET060326 Mitigation: 1 Fan Plant (SBFP) - Design Only 2010-2014 This project was to furnish and install watertight doors below grade at the South Ferry Fan Plant on the Lexington Line in Manhattan as part of the MTA's small business federal mentoring program (SBFP). This project is no longer required; work is being addressed via other projects. Additional funding was provided for construction; budget reflects updated project estimate. This project is no longer required; work is being addressed via other projects. This project is financially closed; budget reflects previously committed tasks.
 
ET060330 Mitigation: 1 Fan Plant on the Flushing Line 2010-2014 This project will provide long term resiliency measures at 2nd Street & 50th Avenue Fan Plant on the Flushing Line in Queens. Work is part of an initiative to address critical fan plants across the system that are vulnerable to coastal storm flooding. Mitigation measures may include, but are not limited to, the following: structural improvements and/or reconstruction of penthouse and vent shaft, installation of watertight doors, and electrical system modifications. This project was split-out from the previously titled "Mitigation: 2 Fan Plants", now "Mitigation: 1 Fan Plant" project. Budget change due to financial closeout activities.
 
ET060331 Mitigation: Steinway Portal Signal Tower 2010-2014 This project will provide flood mitigation improvements at the signal tower adjacent to the Steinway tunnel portal. Work may include installation of concrete perimeter flood walls, stop logs and/or watertight flood doors, as well as sealing of conduit and duct penetrations. Initial budget was established for design. As the project continues to progress, the budget will be increased to fund subsequent phases of design and construction. Budget was adjusted based on the costs of construction and support requirements at the time of award.
 
ET090304 Mitigation: Montague-Furman Substation on the Broadway Line 2010-2014 This project will provide flood prevention measures at substation #57 (Montague-Furman) associated with the Montague Tube. Work may include deploying flood resistant doors, wall penetration treatments, wall reinforcing strategies, installing sump pumps, etc. Additional funding was provided for construction; budget reflects updated project estimate. Schedule adjusted to reflect current work plan; additional time required for redesign and procurement activities. Completion delay due to coordination with Con Edison regarding service connection.
 
ET090306 Mitigation: Substation Hardening at 9 Locations - Design Only 2010-2014 This project will fund design activities for the hardening of 9 substations in flood prone areas of Brooklyn. Work will include replacing personnel doors with flood doors, replacing roll up doors for equipment and vehicular access with hydraulic flood gates or stop logs, replacing personnel access hatch and ventilation and watertight wall and ceiling penetration. Construction has been consolidated into the "Mitigation: Substation Hardening at 24 Locations" project.   Scope was reduced from 11 to 9 locations and made design only. The construction scope and budget of this project was consolidated into the "Mitigation: Substation Hardening at 24 Locations" project. The remaining budget is for previously committed design activities. Schedule updated to reflect current work plan.
 
ET090307 Mitigation: Substation Hardening at 24 Locations 2010-2014 This project will harden 24 substations in flood prone areas of Manhattan, Brooklyn and Queens. Work will include replacing personnel doors with flood doors, replacing roll up doors for equipment and vehicular access with hydraulic flood gates or stop logs, replacing personnel access hatch and ventilation and watertight wall and ceiling penetration. Some of the design is funded under other projects in the capital program. In addition, a portion of the construction cost is funded in the 2010-14 capital program (see Project IDs: T60412J3, T6090219, T6090417, T6160730).   Scope was increased from 11 to 24 locations. This project includes the consolidation of construction scope and budget from the "Mitigation: Substation Hardening at 9 Locations - Design Only" and "Mitigation: Substation Hardening at 4 Locations - Design Only" projects. Schedule updated to reflect current work plan; additional time required for procurement process. Since the total estimate exceeds the federal grant allocation, and additional funding is not available to reallocate, a portion of the cost is funded in the 2010-14 capital program - see multiple projects "Sandy Mitigation: Substation Hardening at 24 Locations" (Project IDs: T60412J3, T6090219, T6090417, T6160730).
 
ET090311 Mitigation: Substation Hardening at 4 Locations - Design Only 2010-2014 This project will fund design activities for the hardening of 4 substations in flood prone areas of Brooklyn and Queens. Work will include replacing personnel doors with flood doors, replacing roll up doors for equipment and vehicular access with hydraulic flood gates or stop logs, replacing personnel access hatch and ventilation and watertight wall and ceiling penetration. Construction has been consolidated into the "Mitigation: Substation Hardening at 24 Locations" project.   Scope was reduced from 5 to 4 locations and made design only. The construction scope and budget of this project was consolidated into the "Mitigation: Substation Hardening at 24 Locations" project. The remaining budget is for previously committed design activities. Schedule updated to reflect current work plan.
 
ET120301 Mitigation Reserve: Depots in Flood Zones, Phase 1 2010-2014 This project was a budgetary reserve; it funds projects to develop and implement flood mitigation measures to protect bus depots located in flood zone areas. Measures will include installation of protective doors and additional capacity power generators. Where applicable more robust measures will be considered, such as relocation of equipment to higher areas, replacement of below-ground storage tanks, backflow preventers, auxiliary pumping equipment, and installation of sea walls. As these mitigation projects are created, funds from this reserve are transferred accordingly. This project is a budget reserve for various mitigation efforts. As the budget is gradually transferred to individual projects for design and construction, the available balance in this project will be reduced. This project was reprogrammed per the MTA Board approved July 2017 Plan Amendment, to distribute funding to individual projects, that align with agency-wide priorities and anticipated funding.
 
ET120302 Mitigation Reserve: Depots in Flood Zones, Phase 2 2010-2014 This project was a budgetary reserve; it funds projects to develop and implement flood mitigation measures to protect bus depots located in flood zone areas. Measures will include installation of protective doors and additional capacity power generators. Where applicable more robust measures will be considered, such as relocation of equipment to higher areas, replacement of below-ground storage tanks, backflow preventers, auxiliary pumping equipment, and installation of sea walls. As these mitigation projects are created, funds from this reserve are transferred accordingly. This project is a budget reserve for various mitigation efforts. As the budget is gradually transferred to individual projects for design and construction, the available balance in this project will be reduced. This project was reprogrammed per the MTA Board approved July 2017 Plan Amendment, to distribute funding to individual projects, that align with agency-wide priorities and anticipated funding.
 
ET120307 Mitigation: Various Bus Depots 2010-2014 This project will provide flood mitigation measures to protect the Casey Stengel, Castleton and Michael J. Quill Depots. Measures will include installation of protective doors and additional capacity power generators. Where applicable more robust measures will be considered, such as relocation of equipment to higher areas, replacement of below-ground storage tanks, backflow preventers, auxiliary pumping equipment, and installation of sea walls. Yukon Depot was initially included in this project; design was completed, but construction was split out and addressed as part of the MTA's small business federal mentoring program (SBFP). Scope was revised from 6 to 4 depots. Schedule adjusted to reflect current work plan. Initial budget was for pre-engineering services. Additional funding was provided for design and construction; budget reflects updated project estimate. Completion delay due to the COVID-19 pandemic and related workforce issues. Additional delay due to site access limitations at Michael J. Quill depot which require modifications to the design parameters.
 
ET120309 Mitigation: Yukon Bus Depot (SBFP) 2010-2014 This project will provide flood mitigation measures at Yukon Bus Depot in Staten Island. Measures will include installation of flood protective doors, flood barrier panels at vents and other openings, french drain and auxiliary pumps, and reinforcement of existing walls. This project is part of the MTA's small business federal mentoring program (SBFP). This project was split-out from the "Mitigation: Various Bus Depots" project. Budget change due to financial closeout activities.
 
ET160309 Mitigation: Near-Term Flood Protection at Stillwell Avenue Terminal Facility (SBFP) 2010-2014 This project will replace the doors of the facility with waterproof doors and install temporary barriers around the perimeter of the site containing the facilities at the Stillwell Avenue Terminal Facility located in the Coney Island area of Brooklyn. This project is part of the MTA's small business federal mentoring program (SBFP). Additional funding was provided for design and construction. The schedule and budget were adjusted based on the work plan and costs of construction and support requirements at the time of award.  
 
L60604YT Employee Facilities Renewals 2010-2014 This project will rehabilitate / replace selected building components at LIRR employee facilities system wide based on need. Building systems targeted for rehabilitation / replacement include: roofs, parking lots, sidewalks, restrooms, driveways, fire alarms, doors, windows, electrical systems, HVAC systems, lighting, painting, and structural repairs.   Project completed and closed
 
L70204V9 Enhanced Station Initiatives [ESI]: Phase 2 - 6 Stations: Great Neck, Bayside, Northport, Valley Stream, Ronkonkoma, and Baldwin. 2015-2019 As part of Enhanced Station Initiatives [ESI], this project will enhance the appearance, function, safety, and customer experience at 6 stations [Package 2]: Great Neck, Bayside, Northport, Valley Stream, Ronkonkoma, and Baldwin. Interior and exterior station renovations will be done at Northport Station. All 6 stations will receive amenities. Station Building Repairs [Northport]: Interior - New floor, wall, ceiling finishes, new doors and windows, new ADA restrooms, new lighting, communication systems, HVAC systems, signage, benches, and information screens. Exterior - New pavers, painting, brick masonry, lighting, digital & static signage, corporate signage, bird deterrents, selective roof repair/replacement, and art. Site Work: Curb replacements and ADA tactile at curb aprons, remove sidewalk & pavers and replace with colored stamped concrete, replace ticket machine shelter, bollards and planter boxes, & aluminum fencing. Amenities Installation [All Stations]: Signage, Wi-Fi Hot Spots hardware, CCTV cameras, totems & backlit boards, bike racks, new Arts for Transit, and trash receptacles.   Substantial completion achieved 6/2019
 
L70204VH Ronkonkoma Garage Stairs Rehab [SBDP] 2015-2019 This project provides for various renewal efforts to the Ronkonkoma Parking Garage that are necessary to maintain the facility in a state of good repair. Work includes: 1. Replacement of the fire protection standpipe system; stairway doors and door frames throughout the garage; and installation of a new fire alarm system. 2. Replacement of the northeast staircase tower [Tower #3].   Substantial Completion achieved 8/2021
 
L70604YV Hillside Facility / Upper Holban Improvements 2015-2019 This project will improve the facilities at Hillside and the nearby Upper Holban facility work includes renewal of doors, electrical systems, flooring, restrooms, site work, and building systems.   Design Completion revised due to continued design work for the HSF Manual Door and Sheridan Shop Driveway
 
L8060406 Rehabilitation of Employee Facilities - Bethpage 2015-2019 This project includes the construction of locker rooms and bathrooms; repair of loading dock and doors; additional rolling doors for equipment, one of which will lead into a fabricated secure area for Stations revenue use; storeroom racking and secure storage; security system modifications; fire and security alarm upgrades; and any other emergency repairs needed for LIRR to occupy the building.    
 
M5029903 Pok Station Bldg-Doors/Windows 2005-2009      
 