Escalator Availability - Metro-North Railroad
WebFOCUS Report
YTD Target: 97.0% YTD Actual: 95.4% Change From Target: -1.63%
Frequency: Monthly Desired Change: Increase
Percent of the time that escalators are operational system wide. Exception-based manual system. If an escalator is down long term (capital work or repair), it is not counted in the stats.